首页> 外文OA文献 >Proposition d'un modèle d'implémentation d'une méthode de management des risques projet: 'Application à deux projets de conception de produits nouveaux'
【2h】

Proposition d'un modèle d'implémentation d'une méthode de management des risques projet: 'Application à deux projets de conception de produits nouveaux'

机译:关于项目风险管理方法的实施模型的建议:“应用于两个新产品设计项目”

摘要

Projects comprise many sources of risks that are as well due to management methods, project management, project team organization, project technical aspects, and environment. This context is imposed on the project team which put up with it and cannot modify it. The team can only know its position compared to the context, which is more or less favorable to the project success, however it is managed therafter. The head of project is responsible for the project success. His goal is to react to the best way the objectives set by the company for the project, with the allocated ressources. To do that, he has a certain room to manoeuvre in an imposed context. The objective of our research is to guide heads of projects in order to optimize the use of this room to manoeuvre, more precisely to conceive fasten, better and less expensive. Project risks management methods have been developed to meet this need. The success of these methods still remains very modest and their perenniality is fragile. To answer this problem, we present in this report an implementation model of a project risks management method made up of three parameters: creation of a new projects teams support profession: Project Riskmanager, control of the coherence of the risks analysis methods in the whole project risks management process, and capitalization of experience through a software support. This model was elaborated and validated by several experiments on two projects of new products design within the Saint Gobain company.
机译:由于管理方法,项目管理,项目团队组织,项目技术方面和环境的原因,项目还包含许多风险来源。该上下文被强加给无法忍受且无法修改的项目团队。与上下文相比,团队只能知道其位置,这或多或少有利于项目成功,但此后对其进行管理。项目负责人负责项目的成功。他的目标是用分配的资源以最佳方式对公司为项目设定的目标做出反应。为此,他在强加的背景下有一定的回旋余地。我们研究的目的是指导项目负责人,以优化该房间的使用方式,更精确地构思固定,更好和更便宜的房间。已经开发了项目风险管理方法来满足这一需求。这些方法的成功仍然非常有限,并且其多年生性很脆弱。为了解决这个问题,我们在本报告中介绍了一个由三个参数组成的项目风险管理方法的实施模型:建立新的项目团队支持专业:项目风险经理,控制整个项目中风险分析方法的一致性风险管理过程,并通过软件支持来资本化经验。该模型是在Saint Gobain公司的两个新产品设计项目上的多个实验中详细阐述和验证的。

著录项

  • 作者

    Verdoux Vanessa;

  • 作者单位
  • 年度 2006
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类