首页> 外文OA文献 >To rehabilitate the road or how to make of a road project an urban project. Ambitions and contradictions.
The case of Marseille.
【2h】

To rehabilitate the road or how to make of a road project an urban project. Ambitions and contradictions.
The case of Marseille.

机译:修复道路或将道路工程改造为城市工程。野心与矛盾。
马赛一案。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The transport infrastructures have a double effect on territory. On one side it creates a link, to connect people but on an other side it consumes space, and can be an urban cut. It requires a reflexion on the potential integration of infrastructures, especially in urban area. Many researchs underline the efforts made to reconcile transport and town planning. In France since the 2000's, the creation of new tools (ex. SCOT) carry on this objective of cohesion and coordination between two policies (transport and habitat). It's one of the main challenge of urban planning.The object of this paper is to consider, from a case of road infrastructure in urban area, how our ways of planning have evolved. Considering sustainability challenge, how to integrate a motorway in a densely populated district? How to develop a road project in the heart of an urban renovation project?My hypothesis is that the oppositions and disconnections continue, in spite of a strong ambition from the actors implied in the project and despite the tools to connect transport and urban projects. In particular the conflicts are revealed by the question of funding. This work is based on a case study: the L2 by-pass in Marseille. This highway link (not completed) is supposed to pass through the North districts. The road project must be an opportunity for a renovation of the poorest districts of Marseille. The timeline profile project and the stakeholders analysis were made from planning documents and interviews with most of the actors invovled in the project. The result of this study shows that the ambitions of coordination are slowed down by a lack of means. Road project and urban project continue to be done separately and to advance according to different rhythms.We will reconsider first the design of the road project, from an urban cut to an integrated and sustainable road. Then we will analyze the challenge raised by the articulation between road and urban projects, and the complexity which results. Finally we will try to explain the separate developments of the two projects.
机译:运输基础设施对领土产生双重影响。一方面,它创建了一个连接人们的链接,但另一方面,它占用了空间,并且可能成为城市的切入点。这需要反思基础设施的潜在整合,尤其是在城市地区。许多研究强调了调和运输和城市规划的努力。自2000年代以来,在法国,新工具(例如SCOT)的创建实现了这两项政策(运输和栖息地)之间的凝聚力和协调性。这是城市规划的主要挑战之一。本文的目的是从城市道路基础设施的案例中考虑我们的规划方式是如何演变的。考虑到可持续性挑战,如何在人口稠密的地区整合高速公路?我的假设是,尽管在项目中暗含着行动者的强烈抱负,尽管有连接交通和城市项目的工具,但我的假设是,反对与分离仍在继续。特别是在资金问题上揭示了冲突。这项工作基于一个案例研究:马赛的L2旁路。该高速公路连接线(未完成)应该穿过北部地区。道路工程必须是翻新马赛最贫困地区的机会。时间线概要项目和利益相关者分析是根据计划文件和与项目中涉及的大多数参与者的访谈进行的。这项研究的结果表明,由于缺乏手段,协调的野心减慢了。道路项目和城市项目将继续分开进行,并根据不同的节奏进行发展。我们将首先重新考虑道路项目的设计,从城市切割到综合可持续道路。然后,我们将分析道路和城市项目之间的衔接所带来的挑战,以及由此带来的复杂性。最后,我们将尝试解释两个项目的独立发展。

著录项

  • 作者

    Leheis Stéphanie;

  • 作者单位
  • 年度 2008
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号