首页> 外文OA文献 >The effect of the reduction of the Hungarian railwayudnetwork in 2009 on accessibility
【2h】

The effect of the reduction of the Hungarian railwayudnetwork in 2009 on accessibility

机译:减少匈牙利铁路的影响网络在2009年的可访问性

摘要

There are two aims of this study. Firstly, to give a quantitative overview on the changingudrailway accessibility due to the reduction of the railway network in 2009 in Hungary.udSecondly, to discuss various forms of detour indices, the main method of analysis. Fromudprevious quantitative analyses of the Hungarian railway network, Csaba Kovács’s (1973)udstudy is to be noted, in which he analysed the geographical location of 197 settlements onudthe railway network. Gábor Szalkai’s (2001) study included dynamic comparisons inudaddition to the static characteristics of the railway network at that time. In addition, ituddescribed the impacts of unmounting the circular railway network due to the Treaty ofudTrianon after the First World War, of mutilating the branch line network after 1968, andudof a potential new Kecskemét-Dunaújváros-Szolnok line on accessibility. The presentudstudy diverges primarily in two aspects from these analyses. On the one hand, it concernsuda smaller railway network after the reduction of railway network in 2007 and in 2009. Asudthe study also aims to analyse the impact on accessibility of closed branch lines after theudschedule change in December 2009, it deals with two networks (smaller than the onesudexamined in earlier studies). However, it does not deal directly with the impact ofudrestarting some lines in June and December 2010. On the other hand, the set of data usedudis wider in the sense that it uses actual schedule data regarding temporal accessibilityudbetween stations.udThe study is concerned both with descriptive analysis of situation and temporaludcomparison; however, it does not deal with economic, cost-effective, environmental,udschedule and other concerns of railway transport, but focuses solely on its supply-side.udTraffic data would be interesting for weighted calculations with the particular networkudelements, but these are not available. I do not touch upon conceptual issues ofudaccessibility, which are well described in Tamás Fleischer’s two studies (Fleischerud2008a, 2008b). In the present analysis, accessibility means whether a given settlementudcan be approached by train, and if so, how far it is from the other settlements
机译:这项研究有两个目的。首先,对由于匈牙利2009年铁路网减少而导致的无障碍通行性进行定量概述。 ud第二,讨论各种形式的tour回指标,这是主要的分析方法。通过对匈牙利铁路网络的以往定量分析,可以注意到CsabaKovács(1973)的研究,其中他分析了该铁路网络上197个定居点的地理位置。 GáborSzalkai(2001)的研究包括了当时铁路网络静态特性的动态比较。此外,它描述了由于第一次世界大战后的udTrianon条约而拆除圆形铁路网,1968年以后破坏了支线网络以及可能的新的Kecskemét-Dunaújváros-Szolnok线对通达性的影响。 。从这些分析中,本研究主要在两个方面有所不同。一方面,它涉及到在2007年和2009年铁路网减少之后的较小的铁路网。此外,该研究还旨在分析2009年12月改期后对封闭支线通达性的影响,处理两个网络(比早期研究中的 udexamine小)。但是,它并不能直接处理 2010年6月和2010年12月重新启动某些线路的影响。另一方面,从某种意义上说,使用的数据集使用的是有关站之间时间可访问性的实际调度数据,因此意义更为广泛。 ud这项研究既涉及对情况的描述性分析,又涉及时间上的 ud比较。但是,它不涉及铁路运输的经济,成本效益,环境,时间表和其他方面的问题,而仅侧重于其供应方。 ud对于特定网络要素的​​加权计算,交通数据会很有趣,但是这些不可用。我并没有涉及“可访问性”的概念性问题,这在TamásFleischer的两项研究中得到了很好的描述(Fleischer ud2008a,2008b)。在当前的分析中,可到达性是指是否可以通过火车接近某个定居点 ud,如果可以,那么它距其他定居点有多远

著录项

  • 作者

    Dusek Tamás;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 hu
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号