首页> 外文OA文献 >ATLAS Pixel Detector ROD card from IBL towards Layers 2 and 1
【2h】

ATLAS Pixel Detector ROD card from IBL towards Layers 2 and 1

机译:从IBL到第2层和第1层的ATLAS像素检测器ROD卡

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The incoming and future upgrades of LHC will require better performance by the data acquisition system, especially in terms of throughput due to the higher luminosity that is expected. For this reason, during the first shutdown of the LHC collider in 2013/14, the ATLAS Pixel Detector has been equipped with a fourth layer— the Insertable B-Layer or IBL—located at a radius smaller than the present three layers. To read out the new layer of pixels, with a smaller pixel size with respect to the other outer layers, a front end ASIC (FE-I4) was designed as well as a new off-detector read-out chain. The latter, accordingly to the structure of the other layers of pixels, is composed mainly of two 9U-VME read-out off-detector cards called the Back-Of-Crate (BOC) and Read-Out Driver (ROD). The ROD is used for data and event formatting and for configuration and control of the overall read-out electronics. After some prototyping samples were completed, a pre-production batch of 5 ROD cards was delivered with the final layout. Another production of 15 ROD cards was done in Fall 2013, and commissioning was completed in 2014. Altogether 14 cards are necessary for the 14 staves of the IBL detector, one additional card is required by the Diamond Beam Monitor (DBM), and additional spare ROD cards were produced for a total initial batch of 20 boards. This paper describes some integration tests that were performed and our plan to install the new DAQ chain for the layer 2, which is the outermost, and layer 1, which is external to the B-layer. This latter is the only layer that will not be upgraded to a higher readout speed. Rather, it will be switched off in the near future as it has too many damaged sensors that were not possible to rework. To do that, slices of the IBL read-out chain have been instrumented, and ROD performance is verified on a test bench mimicking a small-sized final setup. Thus, this contribution reports also how the adoption of the IBL ROD for ATLAS Pixel Detector Layer 2 was developed, with the production of other 40 boards completed and tested in 2015, and how the same approach will be used for the production of the last 45 ROD boards for the Layer 1. This latter fabrication has started on Fall 2015.
机译:LHC的即将到来的升级和未来的升级将要求数据采集系统具有更好的性能,特别是在吞吐量方面,因为预期的发光度更高。因此,在2013/14年度LHC对撞机首次关闭期间,ATLAS像素检测器配备了第四层,即可插入B层或IBL,其半径小于当前的三层。为了读出新的像素层(相对于其他外层而言,像素尺寸更小),设计了前端ASIC(FE-I4)以及新的检测器外读出链。根据其他像素层的结构,后者主要由两个9U-VME读出的离检测器卡组成,分别称为板条箱(BOC)和读出驱动器(ROD)。 ROD用于数据和事件格式化以及整个读取电子设备的配置和控制。在完成一些原型样品后,将交付5张ROD卡的预生产批次,并带有最终版图。 2013年秋季,又生产了15张ROD卡,并于2014年完成调试。IBL检测器的14段五线谱总共需要14张卡,Diamond Beam Monitor(DBM)需要一张额外的卡,以及额外的备用卡ROD卡最初用于生产20块板。本文介绍了已执行的一些集成测试以及我们计划为最外面的第2层和B层外部的第1层安装新的DAQ链。后者是唯一不会升级到更高读出速度的层。相反,它将在不久的将来关闭,因为它有太多损坏的传感器,无法重做。为此,已对IBL读取链的各个部分进行了检测,并在模拟小型最终设置的测试台上验证了ROD性能。因此,该文稿还报告了如何开发IBL ROD应用于ATLAS像素检测器第2层,以及在2015年完成并测试了其他40块板的生产,以及如何将相同的方法用于最后45块板的生产第一层的ROD板。后者的制造已于2015年秋季开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号