首页> 外文OA文献 >Estimating job runtime for CMS analysis jobs
【2h】

Estimating job runtime for CMS analysis jobs

机译:估计CMS分析作业的作业运行时间

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The basic premise of pilot systems is to create an overlay scheduling system on top of leased resources. And by definition, leases have a limited lifetime, so any job that is scheduled on such resources must finish before the lease is over, or it will be killed and all the computation wasted. In order to effectively schedule jobs to resources, the pilot system thus requires the expected runtime of the users jobs. Past studies have shown that relying on user provided estimates is not a valid strategy, so the system should try to make an estimate by itself. This paper provides a study of the historical data obtained from the CMS Analysis Operations submission system. Clear patterns are observed, suggesting that making prediction of an expected job lifetime range is achievable with high confidence level in this environment.
机译:试点系统的基本前提是在租用资源之上创建覆盖计划系统。而且,根据定义,租约的寿命有限,因此在此类资源上计划的任何作业都必须在租约结束之前完成,否则将被终止,并浪费所有计算资源。为了有效地将作业调度到资源,试点系统因此需要用户作业的预期运行时间。过去的研究表明,依靠用户提供的估计不是有效的策略,因此系统应尝试自行进行估计。本文对从CMS Analysis Operations提交系统获得的历史数据进行了研究。观察到清晰的图案,这表明在这种环境下以高置信度可以对预期的工作寿命范围进行预测。

著录项

  • 作者

    Sfiligoi, Igor;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号