首页> 外文OA文献 >Assembly and Characterization of Resistive Plate Chambers in India for the CMS Detector
【2h】

Assembly and Characterization of Resistive Plate Chambers in India for the CMS Detector

机译:印度用于CMS检测器的电阻板腔室的组装和特性

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

The Compact Muon Solenoid (CMS) experiment is a general purpose detector being operated at Large Hadron Collider (LHC) facility at CERN. The RE4 upgrade project was envisaged to improve the Level-1 trigger efficiency in the forward region, when LHC would run at its full designed energy and luminosity after the first Long Shutdown (LS-1, 2013-2014). About 200 RPCs were built for the upgrade at three assembly sites in India, CERN and Ghent. India contributed to 50, RE4/2 RPCs along with 200 Cu-cooling units for the entire upgrade for which the assembly and characterization of RPCs was carried out jointly by Nuclear Physics Division-BARC and Panjab University-Chandigarh. The gas-gaps after their arrival from KODEL, South Korea, underwent mechanical tests for leak and popped spacers, followed by electrical tests for long term monitoring of leakage currents. After the assembly, each RPC was evaluated for its efficiency, cluster size, noise and strip profiles. The Cu-cooling units build at BARC were also tested according to the quality control protocols for any leakage. All the relevant data was uploaded onto the CMS-RPC data base prior to dispatch of RPCs to CERN. At CERN, the RE4/2 type and RE4/3 type RPCs were assembled to a Super Module (SM), which was further tested for the leaks in the Cu-cooling systems. The SMs were then transported to Point 5 and both the End Caps (± RE4) were successfully installed and commissioned in the summer of 2014.
机译:紧凑型μon螺线管(CMS)实验是在CERN的大型强子对撞机(LHC)设施中运行的通用探测器。设想RE4升级项目将提高前部地区的Level-1触发效率,届时LHC将在第一次长时间关闭(LS-1,2013-2014年)后以其完全设计的能量和光度运行。在印度,欧洲核子研究组织(CERN)和根特的三个组装地点建造了大约200个RPC用于升级。印度为50台RE4 / 2 RPC以及200台铜冷却装置提供了整个升级,RPC的组装和表征是由BARC核物理科和Panjab大学-Chandigarh共同完成的。气体间隙从韩国KODEL到达后,进行了机械测试,以检查泄漏和隔离垫是否弹出,随后进行电气测试,以长期监控泄漏电流。组装后,对每个RPC的效率,簇尺寸,噪声和带材轮廓进行评估。 BARC建造的铜冷却装置也根据质量控制协议进行了泄漏测试。在将RPC分发到CERN之前,所有相关数据都已上载到CMS-RPC数据库中。在CERN,RE4 / 2型和RE4 / 3型RPC被组装到一个超级模块(SM)中,该模块进一步进行了铜冷却系统中泄漏的测试。然后将SM运送到第5点,并且两个端盖(±RE4)均已成功安装并于2014年夏季投入使用。

著录项

  • 作者

    Kumar, Ramandeep;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号