首页> 外文OA文献 >ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities
【2h】

ALARA Design Review for the Resumption of the Plutonium Finishing Plant (PFP) Cementation Process Project Activities

机译:ARA整理厂(PFP)固井工艺项目活动恢复的ALARA设计审查

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The requirements for the performance of radiological design reviews are codified in 10CFR835, Occupational Radiation Protection. The basic requirements for the performance of ALARA design reviews are presented in the Hanford Site Radiological Control Manual (HSRCM). The HSRCM has established trigger levels requiring radiological reviews of non-routine or complex work activities. These requirements are implemented in site procedures HNF-PRO-1622 and 1623. HNF-PRO-1622 Radiological Design Review Process requires that ''radiological design reviews [be performed] of new facilities and equipment and modifications of existing facilities and equipment''. In addition, HNF-PRO-1623 Radiological Work Planning Process requires a formal ALARA Review for planned activities that are estimated to exceed 1 person-rem total Dose Equivalent (DE). The purpose of this review is to validate that the original design for the PFP Cementation Process ensures that the principles of ALARA (As Low As Reasonably Achievable) were included in the original project design. That is, that the design and operation of existing Cementation Process equipment and processes allows for the minimization of personnel exposure in its operation, maintenance and decommissioning and that the generation of radioactive waste is kept to a minimum.
机译:放射设计评审的性能要求已编入10CFR835,《职业辐射防护》。汉福德现场放射控制手册(HSRCM)中介绍了对ALARA设计审核的基本要求。 HSRCM已建立触发级别,要求对非常规或复杂的工作活动进行放射学审查。这些要求在现场程序HNF-PRO-1622和1623中实现。HNF-PRO-1622放射学设计审查程序要求“ [对新设施和设备进行放射学设计审查,并对现有设施和设备进行改造”。此外,HNF-PRO-1623放射工作计划流程要求正式的ALARA审核,以应对估计超过1人-rem总剂量当量(DE)的计划活动。此次审查的目的是验证PFP固井工艺的原始设计可确保将ALARA的原则(合理可行的最低标准)包括在原始项目设计中。就是说,现有胶结工艺设备和工艺的设计和操作可以将其操作,维护和退役过程中的人员暴露降至最低,并将放射性废物的产生保持在最低水平。

著录项

  • 作者

    Dayley, L;

  • 作者单位
  • 年度 2000
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号