首页> 外文OA文献 >The Time Value of Risk - A Case Study at the Boron Operations Open Pit Mine
【2h】

The Time Value of Risk - A Case Study at the Boron Operations Open Pit Mine

机译:风险的时间价值-以硼矿露天矿为例

摘要

The evaluation of risk is often performed assuming static conditions when in reality, conditions are continually evolving. In the following dissertation, the evaluation of risk with changing conditions over time is considered for a specific project - placing overburden into an active, open pit mine. The research focuses on the geotechnical components of risk with the goal of identifying whether and to what extent it is possible to place overburden on mined out portions of the open pit slopes. The relevant factors, which change with time or impact risk, are first identified and an evaluation is performed to estimate a probability of failure at various stages of the project life. Potential damages are then assessed by first evaluating the run out distance and post failure geometry of a slope failure and then estimating the percentage of material that would have to be removed to continue extraction of ore. To convert the uncertainty into economic terms, unit values for savings that result from placing overburden in the pit and costs associated with cleaning up failure debris are estimated. The probability of failure, potential for cleanup, and unit values are combined to produce estimates of the likely costs and benefits associated with dumping overburden in the open pit.The results of the analysis indicated that risk varies considerably with time. However, it is possible to place overburden in the central portion of the open pit up to a limit of approximately 80 million tons while maintaining a positive net value of expected costs and benefits.
机译:风险评估通常是在静态条件下进行的,而实际上情况是不断变化的。在下面的论文中,针对特定项目考虑了随时间变化的风险评估-将覆盖层放入活跃的露天矿中。该研究集中在风险的岩土成分上,目的是确定是否以及在何种程度上可能将裸露覆盖在露天矿山边坡的开采部分上。首先确定随时间或影响风险而变化的相关因素,并进行评估以估计项目生命各个阶段的失败概率。然后,通过首先评估边坡破坏的跳动距离和破坏后的几何形状,然后估算继续开采矿石所必须去除的材料的百分比,来评估潜在的损害。为了将不确定性转换为经济术语,估算了因在坑中放置过多的覆盖物而节省的单位价值,以及与清理故障碎屑相关的成本。将失败的可能性,清理的可能性和单位价值结合起来,可以估算出与露天矿山倾倒覆盖层相关的可能的成本和收益。分析结果表明,风险随时间变化很大。但是,有可能在露天矿的中心部分增加覆盖层,使其达到约8000万吨的极限,同时保持预期成本和收益的正净值。

著录项

  • 作者

    Yost Raymond Richard;

  • 作者单位
  • 年度 2009
  • 总页数
  • 原文格式 PDF
  • 正文语种 EN
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号