首页> 外文OA文献 >COMMUNITY’S WATER RESOURCE MANAGEMENT IN UPSTREAM CATCHMENTS OF LARGE RIVER BASIN : A CASE STUDY IN PUA WATERSHED, THAILAND
【2h】

COMMUNITY’S WATER RESOURCE MANAGEMENT IN UPSTREAM CATCHMENTS OF LARGE RIVER BASIN : A CASE STUDY IN PUA WATERSHED, THAILAND

机译:大流域上游流域社区的水资源管理-以泰国PUA流域为例。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Pua Watershed locates in the Upper Nan River Basin upstream of the Sirikit Dam’sreservoir in Nan province, Thailand. The typical problems are often seen such as water shortage with notcope for all utilization of agriculture, consuming, water supply during dry season. Moreover, flood andmudslides often overflow and destroy severely erosion of the river banks and flooding in urban areas andagriculture lands during wet season as well as water quality degradation and poor efficiency management oftheir irrigation systems. Even though the government already constructed with some small to medium scalewater resources development project and alarm systems installation in some risk area of flood and droughtbased on top-down policy with lack of people participation. The problem still occurs, because those systemscould not resolve their needs from local people in their communities. Thus, research for integrated waterresources management for local communities in the upstream catchments of large river basin such as Puawatershed has been carried out based on their needs and participation from those local peoples as bottom-uppolicy. The learning processes of data collection of local watercourses were conducted at firstly as for use tobalance of demands and supplies water resources in Pua watershed. The results show 626 watercourses withannual storage capacity of water of 4.8 million cubic meters which could be served for their own agriculturalarea of 5074 ha and population of 45173 people. Moreover, the watershed produces outflow not only Puaitself but also to downstream watershed as for other users in Nan Province too. Therefore, the strategicplanning to manage water resources based on balancing of natural resources and environment were assignedwith 6 strategic plans, 19 target active plans, and 71 projects within various periods i.e. short, medium, andlong terms, respectively. There were 37 members as for the management council establishment as the aim forefficiently driven those plans and look after as the integrated water resources management in Pua watershed.
机译:Pua流域位于泰国楠府Sirikit大坝水库上游的Nan河上游流域。经常会出现典型的问题,例如缺水,无法应对所有农业利用,耗水,旱季的供水。此外,洪水和泥石流经常溢出并严重破坏河岸的侵蚀和城市地区和农业用地在潮湿季节的洪水,以及水质下降和灌溉系统效率低下。即使政府已经根据自上而下的政策,在缺乏人民参与的情况下,在一些水灾和干旱的危险地区建造了一些中小型的水资源开发项目并安装了警报系统。问题仍然存在,因为这些系统无法解决社区中当地人的需求。因此,已经根据大河流域上游流域(如Puawatershed)的需求和这些当地人民作为自下而上的政策的参与,开展了对当地社区水资源综合管理的研究。首先进行了当地河道数据收集的学习过程,以用于平衡Pua流域的需求和供水。结果表明,有626条河道的年蓄水量为480万立方米,可为自己的5074公顷农业区和45173人口提供服务。而且,该流域不仅产生水体流失,而且与南部省的其他用户一样,也流向下游流域。因此,分别在短期,中期和长期内分配了6个战略计划,19个目标现役计划和71个项目,以自然资源和环境的平衡为基础进行水资源管理的战略计划。管理委员会的设立有37名成员,其目的是有效地推动这些计划,并负责Pua流域的水资源综合管理。

著录项

  • 作者

    CHUENCHOOKLIN Sombat;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号