首页> 外文OA文献 >Some construction methods with three-dimensional thermal and stress coupling analysis for high quality control of concrete structures in cold region
【2h】

Some construction methods with three-dimensional thermal and stress coupling analysis for high quality control of concrete structures in cold region

机译:寒冷地区混凝土结构高质量控制的三维热应力耦合分析施工方法

摘要

The purpose of this research is to control cracking of concrete structures that undergo repeated freezing and thawing in winter in cold regions by applying three dimensional thermal and stress coupling analysis. The temperature, strain, stress etc. of each construction method are examined to improve the process of quality improvement. By applying the equation of three dimensional thermal and stress coupling analysis, this study examined potential for and control of the cracks in concrete structures in the regions, especially in a three dimensional short span of the structure. Relieving restraints on the existing base concrete by a retarder concrete layer, the effects of crack prevention of a crack were better than with either fiber concrete and reinforcing ku concrete. It is necessary to examine the mix proportion suitable for each construction method, because the consistency of the concrete will differ by the construction method.
机译:这项研究的目的是通过应用三维热力和应力耦合分析来控制在寒冷地区冬季反复冻融的混凝土结构的开裂。检查每种施工方法的温度,应变,应力等,以改善质量改进过程。通过应用三维热力和应力耦合分析方程,本研究检查了该区域混凝土结构裂缝的可能性和控制,特别是在结构的三维短跨度中。通过缓凝剂混凝土层减轻了对现有基础混凝土的限制,裂缝的防裂效果比纤维混凝土和补强ku混凝土都要好。有必要检查适合每种施工方法的配合比,因为混凝土的稠度因施工方法而异。

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号