Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-

机译:考虑环境约束的电力系统的概率运行(第13部分)*-对约束的实际满足-

摘要

The optimum start stop scheduling method is reported considering the constraints of both environmental pollution and the probability of power supply, because big and inflexible power stations are being built in spite of load increase and bad load factor of the power system. The proposed method controls the output power of two thermal stations so as to satisfy the line capacities and to make a schedule rapidly although the estimated schedule may not be strictly economical. The emission from each thermal station is controlled only when the whole system state is completely up in order to avoid huge estimations. If the power supply must be stopped to reduce the emission, then it is practically done only when the system includes some down elements. It is shown that the influence of the state probability is sufficiently little by variation of the length of the off service period of the thermal station and that the multistage choice process can be used. The usefulness of this method is concretely shown by estimating the optimum schedule of a model system. The estimating error is investigated by comparing results.
机译:报告了考虑环境污染和供电可能性的最佳起停调度方法,因为尽管负荷增加且电力系统的负荷系数很差,但仍在建造大型且不灵活的发电站。所提出的方法控制两个热站的输出功率,以便满足线路容量并快速制定计划,尽管估计的计划可能并不严格。每个热站的排放仅在整个系统状态完全正常时才进行控制,以避免进行巨大的估算。如果必须停止电源以减少排放,则实际上只有在系统包含一些下降元件时才进行此操作。结果表明,通过改变热站关闭服务时间的长度,状态概率的影响足够小,并且可以使用多级选择过程。通过估计模型系统的最佳计划,具体显示了该方法的有效性。通过比较结果来研究估计误差。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号