首页> 外文OA文献 >Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)
【2h】

Determination of the Loads Restoration Sequence Taking into Account the Cost of Interruption Electrical Service (Consideration of the Deviation of the Cost of Interruptions of Electrical Service)

机译:考虑中断电力成本的负荷恢复顺序的确定(考虑中断电力成本的偏差)

摘要

In the restoration state of a power system, the time taken for a dropped generator to parallel in, and the cost of interruption of electrical service vary according to the, operating conditions just before the fault concerned, the amount of the load expected to be consumed during the fault and accidental factors. In this paper, the authors propose a method of determining the loads restoration sequence which takes into account the cost of interruption of electrical service, in which the above factors are considered. The authors develop a new calculating method which takes into account the distributions of these values. Comparing this method to the one previously presented which used fixed expected values,the authors confirm that the former method is fully capable of determining the loads restoration sequence.
机译:在电力系统恢复状态下,掉下的发电机并联所需的时间以及电力中断的成本会根据相关故障之前的运行条件以及预计要消耗的负载量而变化故障期间和意外因素。在本文中,作者提出了一种考虑电力中断成本的,确定负荷恢复顺序的方法,其中考虑了上述因素。作者开发了一种新的计算方法,该方法考虑了这些值的分布。将这种方法与先前提出的使用固定期望值的方法进行比较,作者确认前一种方法完全有能力确定荷载的恢复顺序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号