A Comparative Study of the Time and Cost Performance of Labour-Only Subcontractors in the Construction Industry in South Western Nigeria

机译:尼日利亚西南地区建筑行业中仅由劳力分包商进行的时间和成本绩效比较研究

摘要

The main contractors are continuously involved in a process of transforming inputsud(materials, labour and- capital} into outputs such as constructed faci lities but they areudusually accompanied by subcontractors and financial institutions among other firms. Thisudstudy therefore examined the performance of labour-only subcontractors in the Nigerianudconstruction industry. The principal objective was to find if any significant difference existsudbetween the time and cost performance of these speciality contractors. In achieving thisudobjective, one hundred questionnaires were distributed to each of the four categories ofudrespondents in the Southwestern region of Nigeria. 75, 88, 56 and 42 questionnairesudwere respectively filled and returned by the main contractors, labour-only subcontractors,udclients and consultants in the study area. Descriptive, parametric and non parametricudstatistical techniques were used for the analysis. Results indicated that significantuddifference exists between time and cost performance of labour-only subcontractors. Theirudmean scores were 4.30 and 3.29 respectively. The labour subcontractor performedudcreditably well in project delivery (time) but there is always cost overruns when comparedudwith the initial estimates of the projects. It was also discovered that subcontractors' timeudperformance is sometimes at the expense of work quality as a result of the speedyudexecution of work at hand in order to pave way for another engagement. It is thereforeudsuggested that project monitoring and supervision should be given a priority attention ifudthis procurement method is to achieve its expected success.
机译:主承包商不断参与将投入物(材料,劳动力和资本)转化为产出的过程,例如建筑设施,但是他们通常由分包商和其他机构的金融机构陪同。因此,本文研究了主要目标是找出这些专业承包商的时间和成本绩效之间是否存在显着差异。为实现这一目标,向每个专业承包商分发了一百份问卷尼日利亚西南地区的四类受访者,分别由研究区域的主要承包商,纯人工分包商,客户和顾问填写并退回了75、88、56和42个调查问卷。使用非参数非统计技术进行分析,结果表明显着非差异仅在劳力分包商的时间和成本绩效之间存在差异。他们的平均得分分别为4.30和3.29。劳动力分包商在项目交付(时间)方面表现出色/出色,但是与项目的初始估算相比总会有成本超支。还发现,由于手头工作的迅速执行,分包商的时间绩效表现有时以牺牲工作质量为代价,以便为其他工作铺平道路。因此,建议如果这种采购方法要取得预期的成功,应优先注意项目的监督和监督。

著录项

  • 作者

    Fagbenle Olabosipo I.;

  • 作者单位
  • 年度 2010
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号