首页> 外文OA文献 >Implementation of Quality-Management Procedures in the Production and Utilization of Cement Stabilized Laterite Interlocking Blocks in Nigeria
【2h】

Implementation of Quality-Management Procedures in the Production and Utilization of Cement Stabilized Laterite Interlocking Blocks in Nigeria

机译:在尼日利亚水泥稳定红土互锁块的生产和使用中实施质量管理程序

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The challenges associated with building materials in Nigeria have been largely blamed for the high cost of housing delivery in the country. As a result, there has been a clarion call for the introduction of cheaper building materials into the Nigerian building construction market. Consequently, various research and development efforts have resulted in the introduction of alternative building materials and their associated technologies. Building materials are expected to meet stipulated standards which will ensure not only their aesthetics but also their appropriateness for their intended uses including structural stability, safety and health of building occupants. A major criticism of alternative building materials in the country has been their non- compliance to quality management procedures in their production and use. This study explores the extent to which quality control measures have been implemented in the production and use of alternative building materials and challenges encountered. The study has been motivated by series of building collapse in the country. Qualitative research method was adopted for the study and involved interviews with purposively selected persons involved in the production and use of alternative building materials in the Lagos area. Findings indicate a low level adoption of quality management procedures due to insufficient training, non-optimum performance of equipment, lack of manuals, time constraints, low education and motivation of workers involved in the production and use of alternative building materials. The paper concludes that in order for the potentials of alternative building materials to be realized in the country, there is a dire need for quality control procedures.
机译:在尼日利亚,与建材相关的挑战主要归因于该国房屋交付成本高昂。结果,人们呼吁将更便宜的建筑材料引入尼日利亚的建筑市场。因此,各种研究和开发工作已导致引入替代建筑材料及其相关技术。预计建筑材料将达到规定的标准,这不仅将确保其美观,而且还将确保其适合其预期用途,包括建筑物居民的结构稳定性,安全性和健康状况。该国对替代建筑材料的主要批评是其在生产和使用中不遵守质量管理程序。本研究探讨了在替代建筑材料的生产和使用中实施质量控制措施的程度以及所遇到的挑战。该研究受到该国一系列建筑倒塌的推动。本研究采用定性研究方法,并与有意挑选的参与拉各斯地区建筑材料生产和使用的人员进行了访谈。调查结果表明,由于培训不足,设备性能未达到最佳水平,缺乏手册,时间紧迫,受教育程度低以及参与生产和使用替代建筑材料的工人的积极性,质量管理程序的采用水平较低。本文的结论是,要想在该国实现替代建筑材料的潜力,迫切需要质量控制程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号