Project Schedule Simulation:Incorporating Human Factors' Uncertainty and Features' Priority in Task Modeling

机译:项目进度模拟:在任务建模中纳入人为因素的不确定性和特征的优先级

摘要

Despite several attempts to accurately predict duration and cost of software projects, initial plans still do not reflect real-life situations. Since commitments with customers are usually decided based on these initial plans, software companies frequently fail to deliver on time and many projects overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional way of modeling schedules. This paper describes a methodology to introduce EPS models in the development of project plans. Our case study findings show clearly the ability of the EPS model to anticipate delays due to human factors and to predict remedial scenarios to adjust to such delays. By comparing EPS to classical schedules, EPS simulation provides more accurate results with regards to project goals. These instructions give you guidelines for preparing papers for Journal of Software (JSW). Use this document as a template if you are using Microsoft Word 6.0 or later. Otherwise, use this document as an instruction set. The electronic file of your paper will be formatted further at Journal of Software. Define all symbols used in the abstract. Do not cite references in the abstract. Do not delete the blank line immediately above the abstract; it sets the footnote at the bottom of this column.
机译:尽管进行了几次尝试来准确预测软件项目的持续时间和成本,但是初始计划仍无法反映实际情况。由于通常根据这些初始计划来决定对客户的承诺,因此软件公司经常无法按时交付,并且许多项目都超出了预算和时间。为了提高初始项目计划的质量,我们在本文中显示了(1)在任务进度表中反映功能的优先级/风险,以及(2)在计划进度表中考虑与人为因素相关的不确定性的重要性。为了使模拟任务反映功能的优先级以及多模式团队分配,引入了增强的项目进度表(EPS),其中添加了补救措施方案(RAS)。它们反映了不确定情况下潜在的计划修改,并促进了所涉及任务的动态排序,而不是静态的传统计划建模方式。本文介绍了在项目计划的开发中引入EPS模型的方法。我们的案例研究结果清楚地表明了EPS模型能够预测人为因素导致的延误并预测补救方案以适应此类延误的能力。通过将EPS与经典进度表进行比较,EPS仿真就项目目标提供了更准确的结果。这些说明为您准备软件期刊(JSW)的论文提供了指导。如果您使用的是Microsoft Word 6.0或更高版本,请将该文档用作模板。否则,将此文档用作说明集。您论文的电子文件将在Journal of Software中进一步格式化。定义摘要中使用的所有符号。不要在摘要中引用参考。不要删除摘要正上方的空白行;它在此列的底部设置了脚注。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号