首页> 外文OA文献 >Avoiding Cost Overruns in Construction Projects in India
【2h】

Avoiding Cost Overruns in Construction Projects in India

机译:避免印度建设项目中的成本超支

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The main aim of this paper is to identify the major reasons for cost overruns in construction projects in India as well as the critical success factors that are helping to avoid the cost overruns. For this, the existing literature is reviewed and critical success factors are identified. Based on them, survey questions and interview questions are prepared. The findings supported the proposed hypothesis, i.e., lack of certain critical success factors leads to cost overruns in construction projects in India. They also confirmed the proposed proactive and reactive strategies of some researchers. The effective critical success factors include appropriate planning in the initial stages, skills of contractors and architects, good relationship and regular coordination among client and contractor, and early contribution of contractor with the project. The ideal methods that help to reduce cost overruns include efficient planning, proper management of site and supervision of the project, suitable planning and arrangement of project, proper methods for construction, regular meetings on development of the project, and hiring proficient subcontractors and suppliers.
机译:本文的主要目的是确定印度建筑项目成本超支的主要原因,以及有助于避免成本超支的关键成功因素。为此,回顾了现有文献并确定了成功的关键因素。基于它们,准备调查问题和面试问题。这些发现支持了所提出的假设,即缺乏某些关键的成功因素会导致印度建筑项目的成本超支。他们还证实了一些研究人员提出的主动和被动策略。有效的关键成功因素包括:在初始阶段进行适当的计划,承包商和建筑师的技能,客户与承包商之间的良好关系和定期协调以及承包商对项目的早期贡献。有助于减少成本超支的理想方法包括有效的计划,适当的场地管理和项目监督,适当的项目计划和安排,适当的施工方法,有关项目开发的定期会议以及雇用精通的分包商和供应商。

著录项

  • 作者

    Shibani A.; Arumugam K.;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 English
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号