Scheduling arc shut downs in a network to maximize flow over time with a bounded number of jobs per time period

机译:调度网络中的电弧关闭以最大程度地增加一段时间内的流量,每个时间段内有一定数量的作业

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

We study the problem of scheduling maintenance on arcs of a capacitated network so as to maximize the total flow from a source node to a sink node over a set of time periods. Maintenance on an arc shuts down the arc for the duration of the period in which its maintenance is scheduled, making its capacity zero for that period. A set of arcs is designated to have maintenance during the planning period, which will require each to be shut down for exactly one time period. In general this problem is known to be NP-hard, and several special instance classes have been studied. Here we propose an additional constraint which limits the number of maintenance jobs per time period, and we study the impact of this on the complexity.
机译:我们研究了在容量网络上的弧形上安排维护的问题,以便在一段时间内最大化从源节点到宿节点的总流量。电弧维护在计划维护期间将电弧关闭,从而使该期间的容量为零。指定了一组电弧以在计划期间进行维护,这将要求每个电弧都在一个时间段内完全关闭。通常,已知此问题是NP难的,并且已经研究了几种特殊实例类。在这里,我们提出了一个额外的约束条件,该约束条件限制了每个时间段内维护工作的数量,并且我们研究了其对复杂性的影响。