首页> 外文OA文献 >Critical issues and key points from the survey to the creation of the historical building information model: The case of Santo Stefano Basilica
【2h】

Critical issues and key points from the survey to the creation of the historical building information model: The case of Santo Stefano Basilica

机译:从调查到创建历史建筑信息模型的关键问题和关键点:圣斯特凡诺大教堂的案例

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The new era of designing in architecture and civil engineering applications lies in the Building Information Modeling (BIM) approach, based on a 3D geometric model including a 3D database. This is easier for new constructions whereas, when dealing with existing buildings, the creation of the BIM is based on the accurate knowledge of the as-built construction. Such a condition is allowed by a 3D survey, often carried out with laser scanning technology or modern photogrammetry, which are able to guarantee an adequate points cloud in terms of resolution and completeness by balancing both time consuming and costs with respect to the request of final accuracy. The BIM approach for existing buildings and even more for historical buildings is not yet a well known and deeply discussed process. There are still several choices to be addressed in the process from the survey to the model and critical issues to be discussed in the modeling step, particularly when dealing with unconventional elements such as deformed geometries or historical elements. The paper describes a comprehensive workflow that goes through the survey and the modeling, allowing to focus on critical issues and key points to obtain a reliable BIM of an existing monument. The case study employed to illustrate the workflow is the Basilica of St. Stefano in Bologna (Italy), a large monumental complex with great religious, historical and architectural assets.
机译:建筑和土木工程应用程序设计的新时代在于建筑信息模型(BIM)方法,该方法基于包括3D数据库的3D几何模型。对于新建筑,这更容易,而在处理现有建筑时,BIM的创建是基于对已建成建筑的准确了解。通常通过激光扫描技术或现代摄影测量技术进行的3D测量允许这种情况,这些测量能够通过平衡最终请求的时间和成本来保证分辨率和完整性方面的足够点云准确性。现有建筑物的BIM方法甚至历史建筑物的BIM方法尚不为人所知,并且经过深入讨论。从调查到模型,以及在建模步骤中要讨论的关键问题,在过程中仍然有多种选择要解决,特别是在处理非常规元素(例如变形的几何形状或历史元素)时。本文介绍了经过调查和建模的全面工作流程,使您可以专注于关键问题和关键点以获得可靠的现有纪念碑的BIM。用于说明工作流程的案例研究是位于意大利博洛尼亚的圣斯特凡诺大教堂,这是一座大型纪念性建筑群,具有巨大的宗教,历史和建筑资产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号