首页> 外文OA文献 >The C-Band accelerating structures for SPARC photoinjector energy upgrade
【2h】

The C-Band accelerating structures for SPARC photoinjector energy upgrade

机译:用于SPARC光注入器能量升级的C波段加速结构

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The use of C-Band structures for electron acceleration and production of high quality beams has been proposed and adopted in several linac projects all over the world. The two main projects that adopted such type of structures are the Japanese Free Electron Laser (FEL) project in Spring-8 and the SwissFEL project at Paul Scherrer Institute (PSI). Also the energy upgrade of the SPARC photo-injector at LNF-INFN (Italy) from 150 to more than 240MeV will be done by replacing a low gradient S-Band accelerating structure with two C-band structures. The structures are Traveling Wave (TW) and Constant Impedance (CI), have symmetric axial input couplers and have been optimized to work with a SLED RF input pulse. The paper presents the design criteria of the structures, the realization procedure and the low and high power RF test results on a prototype. The high power tests have been carried out by the Frascati INFN Laboratories in close collaboration with the Japanese Laboratory KEK. Experimental results confirmed the feasibility of the operation of the prototype at 50 MV/m with about 10(6) breakdowns per pulse per meter. Such high gradients have not been reached before in C-Band systems and demonstrated the possibility to use C-band accelerators, if needed, at such high field level. The results of the internal inspection of the structure after the high power test are also presented.
机译:已经提出在全球多个直线加速器项目中采用并采用C波段结构进行电子加速和产生高质量束的研究。采用这种结构的两个主要项目是Spring-8的日本自由电子激光(FEL)项目和Paul Scherrer Institute(PSI)的SwissFEL项目。此外,通过用两个C波段结构代替低梯度S波段加速结构,可以将LARC-INFN(意大利)的SPARC光电注入器的能量从150MeV升级到240MeV以上。结构为行波(TW)和恒定阻抗(CI),具有对称的轴向输入耦合器,并经过优化以与SLED RF输入脉冲一起使用。本文介绍了原型的结构设计标准,实现步骤以及低功率和高功率RF测试结果。高功率测试是由Frascati INFN实验室与日本实验室KEK密切合作进行的。实验结果证实了以50 MV / m运行原型的可行性,每米每脉冲约有10(6)次击穿。在C波段系统中以前没有达到过如此高的梯度,并证明了在需要时在如此高的磁场水平下使用C波段加速器的可能性。还介绍了高功率测试后结构的内部检查结果。

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号