首页> 外文OA文献 >Mapping surface deformation in open pit iron mines of Carajas Province (Amazon Region) using an integrated SAR analysis
【2h】

Mapping surface deformation in open pit iron mines of Carajas Province (Amazon Region) using an integrated SAR analysis

机译:使用综合SAR分析绘制卡拉哈斯省(亚马逊地区)露天铁矿的表面变形

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The Carajas mineral province encompasses the world's largest iron reserves with excavation carried out through open pit benching. Mining operations in the area have significant areas of rock mass movements and surface displacements that potentially lead to slope instabilities with risks to personnel, equipment and production. Instabilities can be expected due to deep excavations in rock masses of low geomechanical quality, blasting practices and heavy precipitation. In this paper, ground instabilities are monitored through an integrated SAR analysis based on a data-stack of 33 TerraSAR-X images. This approach was designed to monitor distinct displacement regimes, ranging from small to high deformation rates, and to map surface changes, based on variations of radar reflectivity. Results were compared with field information (total station/prisms, ground based radar, geological and geomechanical maps), and the approach showed to be effective for monitoring ground deformation in the region. Due to its capabilities (synoptic view, high accuracy, dense grid sampling), the complementary use of space-based SAR with field monitoring systems proved to be strategic for operational mining planning and risk assessment in this challenging environment. (C) 2015 The Authors. Published by Elsevier B.V.
机译:Carajas矿物省包括世界上最大的铁储量,并通过露天开采进行挖掘。该地区的采矿作业有大量的岩石运动和地表位移,有可能导致边坡失稳,并给人员,设备和生产带来风险。由于岩土力学质量低的深层开挖,爆破作业和大量降水,可能会导致不稳定。在本文中,通过基于33个TerraSAR-X图像的数据堆栈的综合SAR分析来监视地面不稳定性。该方法旨在监视不同的位移范围(从小变形率到高变形率),并根据雷达反射率的变化绘制表面变化图。将结果与现场信息(总站/棱镜,基于地面的雷达,地质和地质力学图)进行了比较,该方法显示出可有效监测该地区的地面变形。由于其功能(全景视图,高精度,密集网格采样),在这种挑战性的环境中,将空基SAR与现场监视系统互补使用被证明是进行采矿计划和风险评估的战略。 (C)2015作者。由Elsevier B.V.发布

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号