首页> 外文OA文献 >Evaluation of best management practices' construction and operation: the fine particles transportation, the infiltration capacity, the soil infiltration loading rate and the geotextile permeability
【2h】

Evaluation of best management practices' construction and operation: the fine particles transportation, the infiltration capacity, the soil infiltration loading rate and the geotextile permeability

机译:评估最佳管理实践的建设和运营:细颗粒运输,渗透能力,土壤渗透负荷率和土工织物渗透性

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This work aimed to evaluate some aspects of construction and operation of full-scale best management practices and their effects on infiltration loading rate. Two systems were studied: i) filter-swale-trench (FST) and ii) infiltration well (IW). In these units, field essays and full-scale measurements were made in order to assess the soil permeability. Further, the fine particles transportation and the geotextile blanket permeability were determined before and after operation. The results pointed out that there were soil transportation to inside the FST and IW systems, despite of the installed protections, and that these material were responsible for diminishing the geotextile (reduction from 30 to 90% for FST and 40 to 70% for IW) and the full-scale infiltration loading rates (varying from 4,7 x 10-6 to 10-5 m.s-1).
机译:这项工作旨在评估全面最佳管理实践的建设和运营的某些方面,以及它们对渗透负荷率的影响。研究了两个系统:i)滤水沟渠(FST)和ii)渗透井(IW)。在这些单元中,进行了现场论文和全面测量,以评估土壤的渗透性。此外,在操作之前和之后确定细颗粒的输送和土工布的渗透性。结果指出,尽管安装了防护装置,但土壤仍向FST和IW系统内部转移,这些材料有助于减少土工布(FST从30%减少到90%,IW从40%减少到70%)以及完整的渗透负荷率(从4.7 x 10-6到10-5 ms-1不等)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号