首页> 外文OA文献 >Post-treatment of effluent of anaerobic baffled reactor using batchwise vertical flow constructed wetland beds
【2h】

Post-treatment of effluent of anaerobic baffled reactor using batchwise vertical flow constructed wetland beds

机译:间歇式垂直流人工湿地床对厌氧折流板反应器的出水进行后处理

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This study evaluated the performance of vertical constructed wetlands treating effluent of anaerobic baffled reactor. The anaerobic reactor volume was 2.3 m³; it was operated with daily flow of 4.6 m³ (12 hours Hydraulic Retention Time). The reactor effluent was split into three wetlands beds, two of them cultivated with macrophytes (Typha sp. and Eleocharis sp.), and one control. The wetlands were operated as a batch reactor. The medium utilized was gravel, the size ranging from 7 to 12 mm. The reaction time for each cycle (filling - reaction - drainage) was 24, 48, 72, and 96 h. The anaerobic reactor achieved the following removal rates: settable solids, 93%; suspended solids, 80%; and COD 39%. The increase in reaction time (up to 72 h) for the constructed wetlands was followed by an increase in turbidity, COD, phosphorus and nitrate removal rates. The Typha sp. bed presented the best phosphorus removal rates. For 72 and 96 h reaction time the observed removal rate was 30 and 25%, respectively.
机译:本研究评估了垂直建造的湿地处理厌氧折流板反应器废水的性能。厌氧反应器体积为2.3立方米;它的日流量为4.6立方米(12​​小时水力停留时间)。将反应器流出物分成三个湿地床,其中两个用大型植物(香蒲属和Eleocharis属)栽培,另外一个作为对照。湿地作为间歇反应器运行。所使用的介质是砾石,大小范围为7至12 mm。每个循环的反应时间(填充-反应-排水)为24、48、72和96 h。厌氧反应器达到以下去除率:固形物,93%;悬浮固体,80%;和化学需氧量39%。人工湿地的反应时间(最多72小时)增加,其浊度,COD,磷和硝酸盐去除率增加。香蒲床中磷去除率最高。在72小时和96小时的反应时间内,观察到的去除率分别为30%和25%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号