首页> 外文OA文献 >Managing steam generator excess units at PT. YKL
【2h】

Managing steam generator excess units at PT. YKL

机译:在PT管理蒸汽发生器的多余机组。 YKL

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Purpose - This paper is to apply lean principles to eliminate excess steam generators in the company.A multifunctional team which has a strong knowledge on process, simulation tools, and broadudprojects knowledge were involved. Methodology/Approach – PT. YKL has five steam stations for running its business, extracting oil from its reservoir.The steam stations are home for 218 steam generators units. As its oil reservoirs mature, naturally the reservoirs require less steam.As the demand drops, PT.YKL needs to balance the supply. As a result, they have excess number of steam generators.They are initially identified it by collecting the unit’s allocation for maintenance and other shutdown issue per steam stations.This available-unit less maintenance-allocation shows the true steam generators supply capability.On the demand side, PT. YKL also looked at its demand forecast profile in the years to come.Defining the excess unit per steam station limits the number of excess unit they can eliminate.To maximize it, PT. YKL totally changed the way they defined the excess.By collecting all the excess in once steam station, they can maximize the number of excess.However, they need to ensure that the remaining steam generators can satisfy the customer’s requirements (in term of flow and pressure).Here simulation tools played its key role.Findings - It was found the implementation of this lean initiative was successfully decommissioned 46 excess steam generators from 218 steam generators.Research limitations / implications: The simulation tool could not exactly represent the actual key process parameters.Site tweaking was stil needed to adjust the key process parameters to achieve the expected performance measures.Value – Limiting the boundaries to define the number of steam generator excess reduce the number of excess unit PT.YKL can claim.By creatively enlarging the boundaries definition to beyond steam station level maximize the number of excess PT. YKL can claim.The project was successfully booked Total Accrued Financial Benefit is $ 5 MM.
机译:目的-本文旨在应用精益原理来消除公司中过多的蒸汽发生器。一个多功能的团队拥有丰富的过程,仿真工具和广泛的项目知识。方法论/方法– PT。 YKL有五个运行其业务的蒸汽站,从其油库中提取石油。这些蒸汽站拥有218台蒸汽发生器。随着油藏的成熟,油藏自然需要较少的蒸汽,随着需求的下降,PT.YKL需要平衡供应。结果,它们的蒸汽发生器数量过多,最初是通过收集每个蒸汽站的维护保养分配和其他停机问题来识别它们的,这种可用单元较少的维护分配表明了蒸汽发生器的真正供应能力。需求方,PT。 YKL还研究了其未来几年的需求预测概况,定义每个蒸汽站的多余单位会限制他们可以消除的多余单位的数量,要最大限度地利用PT。 YKL完全改变了他们定义多余量的方式,通过将所有多余物收集到一个蒸汽站中,可以最大限度地增加多余物的数量,但是,他们需要确保其余的蒸汽发生器能够满足客户的要求(在流量和结果-发现该精益计划的实施已成功淘汰了218台蒸汽发生器中的46台多余的蒸汽发生器。研究局限/意义:该模拟工具无法准确代表实际的关键过程参数。仍然需要进行现场调整,以调整关键工艺参数以实现预期的性能指标。值–限制边界以定义蒸汽发生器的过量数量可减少PT.YKL过量的数量。YKL可以主张。定义要超出蒸汽站水平,以使过量PT的数量最大化。 YKL可以索赔。该项目已成功预订,应计总财务收益为5 MM美元。

著录项

  • 作者

    Kurniawan Made Yeri;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号