首页> 外文OA文献 >Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics
【2h】

Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics

机译:具有初始可用性约束的置换流水车间调度:解决方案和建设性启发式分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

In this paper, we address the problem of scheduling a set of jobs in a flowshop with makespan objective. In contrast to the usual assumption of machine availability presented in most research, we consider that machines may not be available at the beginning of the planning period, due to processing of previously scheduled jobs. We first formulate the problem, analyse the structure of solutions depending on a number of factors (such as machines, jobs, structure of the processing times, availability vectors, etc.), and compare it with its classical counterpart. Results indicate that the problem under consideration presents a different structure of solutions, and that it is easier than the classical permutation flowshop problem. In view of these results, we propose and test a number of fast heuristics for the problem.
机译:在本文中,我们解决了在具有makepan目标的Flowshop中安排一组作业的问题。与大多数研究中通常提出的有关机器可用性的假设相反,我们认为由于处理先前安排的作业,机器可能在计划阶段开始时就不可用。我们首先提出问题,根据许多因素(例如机器,工作,处理时间的结构,可用性向量等)分析解决方案的结构,然后将其与经典的解决方案进行比较。结果表明,所考虑的问题提出了不同的解决方案结构,并且比传统的置换流程商店问题更容易解决。根据这些结果,我们提出并测试了针对该问题的多种快速启发式方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号