首页> 外文OA文献 >Annual Runoff and Sediment in Duhok Reservoir Watershed Using SWAT and WEPP Models
【2h】

Annual Runoff and Sediment in Duhok Reservoir Watershed Using SWAT and WEPP Models

机译:利用SWAT和WEPP模型的Duhok水库集水区年径流和泥沙

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

Estimation of runoff volume and sediment load is the main problem that affects the performance of dams due to the reduction in the storage capacity of their reservoirs and their effect on dam efficiency and operation schedule. The simulation models can be considered for this purpose if the continuous field measurements are not available. Soil and Water Assessment Tool (SWAT) andWater Erosion Prediction Project (WEPP) models were applied to estimate the annual runoff volume and sediment load for Duhok Dam Reservoir in north of Duhok/Iraq for the period 1988-2011. The estimated annual runoff volume varied from 2.3 to 34.7 MCM for considered period.Those values were affected by rainfall depth, intensity and runoff coefficient. The resultant annual runoff coefficient for the studied area ranged from 0.05 to 0.35 (average was 0.18) causing an average runoff volume of about 14 MCM. The results of sediment routing indicated that the values of sediment yields varied from 50 to 1400 t/km2/year depending on sub basin properties. The average annual sediment load from the whole watershed is about 120 × 103 ton. The estimated total sediment arrived to Duhok Reservoir for the considered period 1988-2011 was about 2.9 × 106 ton. The results indicate that both models gave reasonable results in comparison with measured values. Based on statistical criteria, the results of both models are close to gather.
机译:估计径流量和泥沙负荷是影响大坝性能的主要问题,这是由于其水库的储水量减少以及对大坝效率和运行进度的影响。如果无法进行连续的现场测量,可以考虑使用仿真模型。应用土壤和水评估工具(SWAT)和水蚀预测项目(WEPP)模型来估算1988-2011年间杜霍克/伊拉克北部杜霍克水库的年径流量和泥沙量。在考虑的时期内,估计的年径流量从2.3到34.7 MCM不等,这些值受降雨深度,强度和径流系数的影响。研究区域的最终年径流系数范围为0.05至0.35(平均值为0.18),导致平均径流量约为14 MCM。沉积物路由结果表明,取决于次流域性质,沉积物产量值在50至1400 t / km2 /年之间变化。整个流域的年平均沉积物负荷约为120×103吨。在1988-2011年的考虑期间内,估计到达杜霍克水库的沉积物总量约为2.9×106吨。结果表明,与测量值相比,两个模型均给出了合理的结果。根据统计标准,两个模型的结果都接近。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号