首页> 外文OA文献 >Monitoring and Evaluating the Sedimentation Process in Mosul Dam Reservoir Using Trap Efficiency Approaches
【2h】

Monitoring and Evaluating the Sedimentation Process in Mosul Dam Reservoir Using Trap Efficiency Approaches

机译:用捕集效率法监测和评价摩苏尔水库泥沙淤积过程。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Reservoirs are usually exposed to sediment accumulation problems that will lead to reduction in their storage capacity. This problem directly affects the performance of the dams and causes shortage of their useful life. The simplest technique to estimate sediment deposition rate is using sediment rating curve with sediment trapping efficiency (TE) of the reservoir. Many empirical and semi-empirical approaches have been suggested for to determine this term depending on the annual inflow rate, reservoir characteristics and features of the catchments area. In this study six different empirical methods depending on the residence time principle (water retention time) were used. These approaches were reviewed and applied to determine TE of Mosul dam reservoir (MDR) for period 1986 to 2011. The monthly operating data for inflow, outflow and water elevations for MDR were used to determine monthly TE and long-term TE for whole period of MDR using the mentioned methods. Furthermore, the monthly inflow rate for River Tigris upstream MDR, its sediment rating curve and sediment feeding from valleys around MDR were used to estimate the amount sediment coming to the reservoir. The results provided by these methods for TE withsediment coming to MDR were used to compute the amount of sediment deposited in MDR on monthly bases during this period. The results obtained were evaluated using observed bathymetric survey data that had been collected in 2011 after 25 years of the operation of the dam. The results showed all the mentioned methods gave convergent results and they were very close to bathymetric survey results for estimating the volume of sediment deposited especially that proposed by Ward which gave 0.368% percentage error. Furthermore, the result computed using monthly TE gave good agreement if compared with that long-term TE where the percentage error was ranging between −3.229% to 1.674% for monthly adopted data and −4.862% to −2.477% for whole period data. It is believed that this work will help others to use this procedure on other reservoirs.
机译:水库通常面临沉积物堆积的问题,这将导致它们的储存能力下降。该问题直接影响水坝的性能,并导致其使用寿命不足。估算沉积物沉积速率的最简单技术是使用具有储层沉积物捕获效率(TE)的沉积物额定曲线。已经提出了许多经验和半经验方法来确定该术语,这取决于年流入量,储层特征和集水区的特征。在这项研究中,根据停留时间原理(保水时间)使用了六种不同的经验方法。对这些方法进行了审查并应用于确定1986年至2011年期间的摩苏尔大坝水库(MDR)的TE。使用MDR的流入,流出和水高的月度运行数据来确定整个月度的TE和长期TE。使用上述方法的MDR。此外,利用底格里斯河MDR上游的月流入量,其泥沙定额曲线和从MDR周围山谷的泥沙进给来估算进入水库的泥沙量。这些方法提供的关于TE沉降进入MDR的结果用于计算此期间月度基础上MDR中沉积的沉积物数量。使用观察的测深调查数据对获得的结果进行评估,该数据是在大坝运营25年后于2011年收集的。结果表明,上述所有方法均给出了收敛的结果,并且与测深法的测量结果非常接近,尤其是沃德提出的沉积误差为0.368%的沉积物体积估算。此外,与长期TE相比,使用月度TE计算的结果具有很好的一致性,后者对于月采用数据,百分比误差在−3.229%至1.674%之间,对于整个期间数据,误差在−4.862%至−2.477%之间。相信这项工作将帮助其他人在其他储层上使用该程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号