首页> 外文OA文献 >Development and Testing of the Orion CEV Parachute Assembly System (CPAS)
【2h】

Development and Testing of the Orion CEV Parachute Assembly System (CPAS)

机译:Orion CEV降落伞组装系统(CPAS)的开发和测试

摘要

The Crew Exploration Vehicle (CEV) is an element of the Constellation Program that includes launch vehicles, spacecraft, and ground systems needed to embark on a robust space exploration program. As an anchoring capability of the Constellation Program, the CEV shall be human-rated and will carry human crews and cargo from Earth into space and back again. Coupled with transfer stages, landing vehicles, and surface exploration systems, the CEV will serve as an essential component of the architecture that supports human voyages to the Moon and beyond. In addition, the CEV will be modified, as required, to support International Space Station (ISS) mission requirements for crewed and pressurized cargo configurations. Headed by Johnson Space Center (JSC), NASA selected Jacobs Engineering as the support contractor to manage the overall CEV Parachute Assembly System (CPAS) program development. Airborne Systems was chosen to develop the parachute system components. General Dynamics Ordnance and Tactical Systems (GD-OTS) was subcontracted to Airborne Systems to provide the mortar systems. Thus the CPAS development team of JSC, Jacobs, Airborne Systems and GD-OTS was formed. The CPAS team has completed the first phase, or Generation I, of the design, fabrication, and test plan. This paper presents an overview of the CPAS program including system requirements and the development of the second phase, known as the Engineering Development Unit (EDU) architecture. We also present top level results of the tests completed to date. A significant number of ground and flight tests have been completed since the last CPAS presentation at the 2007 AIAA ADS Conference.
机译:乘员探索飞行器(CEV)是星座计划的一个组成部分,其中包括运载火箭,航天器和地面系统,这是启动强大的太空探索计划所必需的。作为“星座计划”的锚定能力,CEV必须具有人工评级,并将载人和货物从地球带入太空并再次返回。结合转移平台,登陆车和水面探测系统,CEV将成为支持人类登月及以后航行的体系结构的重要组成部分。此外,将根据需要修改CEV,以支持国际空间站(ISS)对载人和增压货物配置的任务要求。由约翰逊航天中心(JSC)领导的NASA选择了Jacobs Engineering作为支持承包商,以管理整个CEV降落伞组装系统(CPAS)程序的开发。选择机载系统来开发降落伞系统组件。通用动力军械和战术系统(GD-OTS)被分包给机载系统,以提供迫击炮系统。因此,成立了JSC,Jacobs,Airborne Systems和GD-OTS的CPAS开发团队。 CPAS团队已完成设计,制造和测试计划的第一阶段,即第一代。本文概述了CPAS程序,包括系统要求和第二阶段的开发,即工程开发单元(EDU)架构。我们还将介绍迄今为止完成的测试的顶级结果。自从2007年AIAA ADS会议上的CPAS演讲以来,已经完成了大量的地面和飞行测试。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号