首页> 外文OA文献 >A soil management technique to enhance lateral infiltration (subbing) in permanent raised beds
【2h】

A soil management technique to enhance lateral infiltration (subbing) in permanent raised beds

机译:一种土壤管理技术,可增强永久性高架床中的侧向渗透(胶合)

摘要

Permanent raised beds (PRBs) are less susceptible to poor subbing in Australian Vertosol due to prolonged irrigation times and faster subbing in cracks. In contrast, subbing was very poor in sandy clay loam soil. This study revealed enhanced lateral subbing with blade ploughing. However, additional measures of irrigation optimisation for improved infiltration opportunity time and/or water depth in furrow can be beneficial in sandy clay loam soil.
机译:由于延长的灌溉时间和更快的裂缝沉降,永久性高架床(PRB)在澳大利亚Vertosol中不易受到较差的沉降作用。相反,在砂质壤土中,胶合层非常差。这项研究表明,通过铲刀耕作可以增强侧向胶合。然而,在沙质壤土中,灌溉优化的附加措施可以改善入渗时间和/或犁沟的水深,这可能是有益的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号