Common risks affecting time overrun in road construction projects in Palestine: Contractors’ perspective

机译:承包商认为,影响巴勒斯坦道路建设项目时间超支的常见风险

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The construction sector is one of the key economic sectors and is the main force motivating the Palestinian national economy. However, it suffers from number of problems that affect time, cost and quality performances. This study aims at identifying the common risks affecting time overrun in road construction projects in the West Bank in Palestine from contractors’ viewpoint. 45 factors that might cause delays of road construction projects were defined through a detailed literature review. A questionnaire survey was performed to rank the considered factors in terms of severity and frequency. The analysis of the survey indicated that the top risks affecting time overrun in road construction projects in Palestine are: financial status of the contractors, payments delay by the owner, political situation, segmentation of the West Bank, poor communication between construction parties, lack of equipment efficiency, and high competition in bids.
机译:建筑部门是关键的经济部门,是推动巴勒斯坦国民经济发展的主要力量。然而,它遭受许多影响时间,成本和质量性能的问题。这项研究旨在从承包商的角度确定影响巴勒斯坦西岸道路建设项目时间超支的常见风险。通过详细的文献综述,确定了可能导致道路建设项目延迟的45个因素。进行了问卷调查,以根据严重程度和频率对考虑的因素进行排名。对调查的分析表明,影响巴勒斯坦道路建设项目时间超支的最大风险是:承包商的财务状况,业主付款延迟,政治局势,西岸分割,建设方之间沟通不良,缺乏合作关系设备效率高,竞标竞争激烈。

著录项

  • 作者

    Mahamid Ibrahim;

  • 作者单位
  • 年度 2013
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类