首页> 外文OA文献 >Prioritising Project Scope Definition Elements in Public Building Projects
【2h】

Prioritising Project Scope Definition Elements in Public Building Projects

机译:在公共建筑项目中优先考虑项目范围定义元素

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

A complete definition of the scope of a project upfront during early stages ensures smooth and successful implementation during the project execution. This research identifies and prioritises project scope definition elements for public buildings in Saudi Arabia. Elements that could significantly contribute to complete project scope definition package at pre-project planning stage are identified and their interrelationship determined and prioritised. Using the Project Definition Rating Index (PDRI) as a basis, the study uses analytical network process (ANP) technique based on data obtained from project managers who have been involved in public sector projects in Saudi Arabia. Data collection and analysis was conducted in three steps. The first step involved identification of scope definition elements while the second involved an investigation into interrelationships among the elements. In the third step, ANP was used to determine the weight of the elements’ importance in terms of contribution to project scope definition completeness. Finally, Pareto analysis was used to prioritise and assess the distribution pattern of the elements. The outcome from this research is the prioritisation of project scope definition elements for public building projects in Saudi Arabia. The prioritised list developed indicates the importance of project scope definition elements. It should help project management teams identify elements to consider when evaluating project scope definition for completeness at the pre-project planning stage. Keywords: Project scope definition, pre-project planning, prioritising, public building projects, Saudi Arabia, Analytical Network Process (ANP)
机译:在早期阶段就项目范围的完整定义可以确保在项目执行过程中顺利,成功地实施。这项研究确定并优先考虑沙特阿拉伯公共建筑的项目范围定义元素。确定在项目前规划阶段可能对完整项目范围定义包有重大贡献的要素,并确定其相互关系并确定优先级。该研究以项目定义评级指数(PDRI)为基础,基于从参与沙特阿拉伯公共部门项目的项目经理获得的数据中使用了分析网络过程(ANP)技术。数据收集和分析分三个步骤进行。第一步涉及范围定义元素的标识,而第二步涉及元素之间相互关系的调查。第三步,使用ANP来确定要素重要性的权重,以其对项目范围定义完整性的贡献。最后,使用帕累托(Pareto)分析确定要素的优先级并评估其分布方式。这项研究的结果是确定了沙特阿拉伯公共建筑项目的项目范围定义元素的优先级。制定的优先列表表明了项目范围定义元素的重要性。它应帮助项目管理团队确定在项目前规划阶段评估项目范围定义的完整性时要考虑的要素。关键字:项目范围定义,项目前规划,优先次序,公共建筑项目,沙特阿拉伯,分析网络过程(ANP)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号