首页> 外文OA文献 >Energy System Modelling: Power Plant Dispatch and Electricity Generation Costs
【2h】

Energy System Modelling: Power Plant Dispatch and Electricity Generation Costs

机译:能源系统建模:电厂调度和发电成本

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The growing share of intermittent renewable energy on the electricity production has also an influence on the remaining thermal power plants. The full load hours, especially of fossil fired power plants, are decreasing over time. In the meantime, the energy surplus produced by renewable sources is increasing and without building new controllable power plants, the back-up capacity is decreasing because old fossil fired power plants will shut down. A lot of modelling has been done in this field yielding to very different results. This paper shows a generic approach to the calculation of the power plant dispatch and the electricity generation cost. The main focus is on the influence different scenario assumptions can have on the outcome of the investigation. The aim is to show how important an extensive sensitivity analyses is. As the ambitious climate targets of the government, the strong development of intermittent renewable energies as well as the nuclear phase out provide very good scenarios, the model will be explained on the example of Germany.
机译:间歇性可再生能源在电力生产中所占份额的增加也影响了其余的火力发电厂。随着时间的流逝,特别是化石发电厂的满负荷小时数正在减少。同时,可再生资源产生的能源过剩正在增加,并且在没有建立新的可控电厂的情况下,备用容量正在减少,因为旧的化石燃料发电厂将关闭。在该领域已进行了大量建模,​​得出了截然不同的结果。本文展示了一种通用的方法来计算电厂调度和发电成本。主要重点在于不同情景假设可能对调查结果产生的影响。目的是显示广泛的敏感性分析的重要性。由于政府雄心勃勃的气候目标,间歇性可再生能源的强劲发展以及逐步淘汰核能提供了很好的方案,因此将以德国为例来说明该模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号