In this paper the attention is on the heat losses of a main, aboveground supply, hot-water pipeline, whose length is 5430 m. It is situated between the Šoštanj Thermal Power Plant (TEŠ) and the Central Energy Station (CES) Velenje as part of the district heating system in the Šaleška Valley. It was renovated because major heat losses were identified. A numerical analysis and a comparison between the temperature fields of the pipe\u27s insulation before and after the renovation was performed to discover the main causes for the high heat losses before renovation. An integral measuring method for determining the heat losses was adapted and used to determine the pipeline\u27s heat losses after the renovation. Taking into consideration the real operating parameters, the annual energy savings and the consequent operational cost reduction, due to the lower heat losses, resulting from the pipeline renovations, are presented. The calculation is made with measured heat-loss coefficients and is therefore based on the real state of the pipeline. The aim is to show the necessity to investigate the heat losses of a hot-water pipeline whose design or state of insulation is questionable.
机译:本文关注的是一条主要的地上供水热水管道的热损失,该管道的长度为5430 m。它位于Šoštanj热电厂(TE)和Velenje中央能源站(CES)之间,是Šaleška谷地热系统的一部分。由于发现了主要的热量损失,因此对其进行了翻新。进行了改造前后管道保温层温度场的数值分析和比较,发现了改造前热损失高的主要原因。调整了用于确定热损失的整体测量方法,并将其用于确定翻新后管道的热损失。考虑到实际的运行参数,提出了每年的节能量以及由于管道翻新带来的较低的热损失而导致的运行成本降低。该计算是根据测得的热损失系数进行的,因此基于管道的实际状态。目的是表明有必要研究设计或隔热状态有问题的热水管道的热损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号