This article considers the analysis of thermal performance annular heating furnace located at the Chelyabinsk Pipe Rolling Plant. There are problems arising from the operation of the furnace, given the purpose of the reconstruction of its systems and components. During the analysis of the existing system identified and suggestions for solving these drawbacks.
展开▼