首页> 外文OA文献 >Control system design and commissioning of photovoltaic trough concentrator systems installed at the Murdoch University South St campus
【2h】

Control system design and commissioning of photovoltaic trough concentrator systems installed at the Murdoch University South St campus

机译:默多克大学南圣校区安装的光伏槽式聚光器系统的控制系统设计和调试

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This thesis is concerned with the upgrades to the Photovoltaic Trough array now installed at the Murdoch campus. The array was originally installed in Rockingham as a single 80 panel array. The project was taken over by the engineering department to restore its functionality as a teaching resource. As part of the relocation the array of panels was split into 3 smaller systems. A Large array with 40 panels and 2 smaller arrays with 8 panels each. The key components of this project were to design, implement and test control systems on the 3 arrays. ududThe project consisted of two basic streams of work. The Large array being the first stream which required more implementation and testing to revive the existing control system by using the old controller with new wiring and some minor upgrades to the way it operates. The second stream involved the designing of a new control system for the two identical smaller systems from the ground up. This required a bit of problem solving adapting left over structural components to work with VSD’s directly mounted to the axis of the system. The two streams ran in parallel with downtime in one utilised in the other. ududThe large array control system at the end of this project is now tracking the sun again. This stream of the process is now complete with the array ready to be connected to inverters to convert their generated power into useable power by the electricity grid. This stream of the project was prioritised over the smaller arrays stream as other projects are reliant on the completion of this part such as the connection of the inverters. ududThe small array stream has been extensively designed and is nearly ready to move onto the implementation phase. Due to the time constraints of the technical staff at the University, manufacturing will be delayed until the completion of the new engineering building. Documentation of the work undertaken will help any future projects complete the small system for use as a teaching resource.
机译:本文涉及的是对默多克校区现已安装的光伏槽阵列的升级。该阵列最初作为单个80面板阵列安装在Rockingham中。工程部门接管了该项目,以恢复其功能作为教学资源。作为搬迁的一部分,面板阵列分为3个较小的系统。具有40个面板的大型阵列和每个具有8个面板的2个较小的阵列。该项目的关键组件是在3个阵列上设计,实施和测试控制系统。 ud ud该项目包含两个基本工作流。大阵列是第一个需要通过实施和测试来恢复现有控制系统的流,这是通过使用带有新接线的旧控制器以及对其操作方式进行的一些小升级来实现的。第二阶段涉及从头开始为两个相同的较小系统设计新的控制系统。这就需要解决一些问题,以适应剩余的结构组件,以便与直接安装在系统轴上的VSD一起使用。两条流与停机时间并行运行,另一条流则与停机时间并行。 ud ud该项目结束时的大型阵列控制系统现在再次跟踪太阳。现在,该过程已经完成,阵列已准备就绪,可以连接到逆变器,以通过电网将其产生的功率转换为可用功率。该项目流的优先级高于较小的阵列流,因为其他项目依赖于此部分的完成,例如逆变器的连接。 ud ud小型阵列流已经过广泛的设计,几乎可以进入实施阶段了。由于大学技术人员的时间限制,制造将被推迟到新的工程大楼竣工。记录所进行的工作将有助于将来的任何项目完善作为教学资源的小型系统。

著录项

  • 作者

    Edwards Rhyss;

  • 作者单位
  • 年度 2010
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号