首页> 外文OA文献 >Integrated water management of non-process water flows at Newmont’s Waihi Goldmine, North Island, NZ.
【2h】

Integrated water management of non-process water flows at Newmont’s Waihi Goldmine, North Island, NZ.

机译:新西兰北岛纽蒙特的怀希金矿的非工艺水流综合水管理。

摘要

This paper reviews 2 field trips to the Waihi Goldmine (2007/9) and the application of water auditing techniques to assist with Waihi’s Environmental Water Management Strategy. In New Zealand’s high rainfall areas the legal and regulatory framework for water use in mining is structured differently to Australia’s water allocation right’s to abstract water for mining operations. New Zealand’s Resource Management Act 1991 enables mining operations to abstract, treat and discharge water via the Act’s Resource Consents and Water Rights Bill. Therefore, the mining operation must obtain ‘Consents’ permission from local and regional authorities to manage their water stocks. Water monitoring and quality testing is carried out by Waihi Goldmine’s Environmental Department and local and regional testing authorities. The integration of both water quality testing and water quantity measurement is integral to complying with the RMA ’91 ‘Consent’ to discharge treated water from Waihi Goldmine’s water treatment plant and its newly commissioned reverse osmosis treatment plant. Apart from process water feed to all aspects of the mining operation this paper examines the non-process water flows and the management of the treatment of non-process water at a set discharge parameter both with quality and quantity under the RMA ‘91 ‘Consent’ conditions. The findings contribute towards a water management strategy that assists with the site’s ongoing ability to deal with water treatment and discharge of an area in a high rainfall region.
机译:本文回顾了两次怀伊金矿(2007/9)的实地考察,以及水审计技术在协助怀伊的环境水管理战略中的应用。在新西兰的高雨量地区,采矿用水的法律和法规框架的结构与澳大利亚为采矿作业取水的水分配权不同。新西兰的1991年《资源管理法》通过该法的《资源同意和水权法案》,使采矿作业可以提取,处理和排放水。因此,采矿业务必须获得地方和地区当局的“同意”许可,以管理其水资源储备。 Waihi Goldmine的环境部门以及当地和地区的测试机构对水进行监控和质量测试。水质测试和水量测量的集成是遵守RMA ‘91’Consent’协议的必要组成部分,以从Waihi Goldmine的水处理厂及其新投产的反渗透处理厂排放经处理的水。除了为采矿作业的各个方面提供过程用水外,本文还根据RMA '91'同意',对非过程水流量以及设定质量和数量的既定排放参数下非过程水的处理管理进行了研究。条件。这些发现有助于制定水管理策略,以帮助该站点持续处理高雨量地区的水处理和排放。

著录项

  • 作者

    Cocks R.J.; Ho G.; Anda M.;

  • 作者单位
  • 年度 2011
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号