首页> 外文OA文献 >Boddington gold mine expansion project
【2h】

Boddington gold mine expansion project

机译:博丁顿金矿扩建项目

摘要

The purpose of this document is to provide an overview of the projects undertaken with Aker Solutions in an industrial placement at Boddington Gold Mine as a requirement for the instrumentation and controls engineering internship unit at Murdoch University.ududThis report looks into the objectives of the internship and the documents and drawings to be used and understood, along with all the relevant field instrumentation to be used on site. This report also covers the projects undertaken during the period of the internship including the Reverse Osmosis (RO) Plant Number 1 and the detailed engineering review undertaken on all vendor supplied packages. As I will be continuing to work on the Boddington Gold Mine Expansion Project after the culmination of internship period this report will go through some of the other projects that are upcoming within the next couple of weeks.
机译:本文的目的是概述与Aker Solutions在Boddington金矿的工业场所中进行的项目,这是对默多克大学仪器与控制工程实习单位的要求。 ud ud本报告调查了以下目标:实习以及要使用和理解的文件和图纸,以及将在现场使用的所有相关现场仪器。该报告还涵盖了在实习期间进行的项目,包括1号反渗透(RO)工厂以及对所有供应商提供的包装进行的详细工程审查。在实习期结束后,由于我将继续从事Boddington金矿扩建项目的工作,因此本报告将审议在接下来几周内即将进行的其他一些项目。

著录项

  • 作者

    Funnekotter Dirk;

  • 作者单位
  • 年度 2008
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"en","name":"English","id":9}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号