首页> 外文OA文献 >The temporal analysis of area capacity curve of Hirakud reservoir
【2h】

The temporal analysis of area capacity curve of Hirakud reservoir

机译:希拉库德水库库容曲线的时间分析

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Humans has found various ways to use water and construction of dam and reservoir for the storage being one of them. Water is stored to be used for purpose of drinking, irrigation, power generation, etc. The reservoir sedimentation plays a vital role in the determining the storage capacity in any reservoir thereby directly influencing the water available for irrigation, power generation. The rate of sedimentation of any reservoir or dam is defined by silt index. One of the most important physical characteristics of dams and their reservoirs are area-capacity curves. Area-capacity curves are important for defining the storage capacity of the reservoir, thereby can be used in reservoir operation, reservoir flood routing, determination of capacity and water spread corresponding to each elevation This study deals with analyzing the area capacity curve using ILWIS 3.3 software to find the area and cone formula to find the corresponding capacity or volume. Then thorough analysis of reduction in capacity from the time of construction to year 2012. It also deals with changes in water spread area for different reservoir for different year and the results obtained are compared for different years and RLs to the original data at the time when it was first functioned. The interest for studying Hirakud dam comes from it being the longest man-made dam in the world which extends 16 miles (26 Km) in length which was constructed in between 1948-1957 with estimated cost of 1.01 billion.
机译:人类已经发现了多种用水方式以及建造水坝和水库的方法之一。储存水用于饮用水,灌溉,发电等目的。水库沉淀在确定任何水库的储水量方面起着至关重要的作用,从而直接影响可用于灌溉,发电的水。任何水库或大坝的沉降速率由淤泥指数定义。大坝及其水库最重要的物理特征之一是面积-容量曲线。面积-容量曲线对于定义水库的存储容量非常重要,因此可用于水库运行,水库洪水调度,确定与每个海拔高度相对应的容量和水扩散。本研究使用ILWIS 3.3软件分析区域容量曲线。查找面积和圆锥公式以查找相应的容量或体积。然后,对从建设到2012年的容量减少进行彻底分析。它还处理了不同年份不同水库的水扩散面积的变化,并将不同年份和RLs的结果与当时的原始数据进行了比较。它首先起作用。研究Hirakud大坝的兴趣来自于它是世界上最长的人造水坝,它的长度为16英里(26公里),建于1948年至1957年之间,估计耗资10.1亿美元。

著录项

  • 作者

    Tobgay S;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号