首页> 外文OA文献 >A Comparative Study Between Priority Assigning Method And Lambda Iteration Method For Unit Commitment Problems
【2h】

A Comparative Study Between Priority Assigning Method And Lambda Iteration Method For Unit Commitment Problems

机译:单元承诺问题优先分配法与Lambda迭代法的比较研究。

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。
获取外文期刊封面目录资料

摘要

Our project report basically focuses on the Unit Commitment Scheduling of Thermal power stations so as to obtain the most optimized way of power production fulfilling the total load requirements, transmission losses and at a same time integrating all the safety measures required. The Unit Commitment is a complex decision making process because of multiple constraints which may not be violated while finding the Optimal Commitment Schedule .This report also deals with the Economic Load Dispatch through Equal Incremental Cost of different operating units so as to have the most efficient and economical generation from different units with sufficient reserve capacity to meet any abnormal operating conditions. The goal of the objective function is in cost reduction ,so we use the economic dispatch using the lambda iteration method when we calculate the production cost. Methods for assigning priority to different generating units are also discussed in brief. Finally we wish to solve a load flow solution using Two Different Approaches and compare their result to get the most optimized way of generation and verify it using MATLAB.
机译:我们的项目报告主要侧重于火力发电厂的机组承诺计划,以便获得最优化的发电方式,以满足总负荷要求,输电损耗并同时整合所需的所有安全措施。单位承诺是一个复杂的决策过程,因为在找到最佳承诺进度表时可能不会违反多个约束条件。本报告还通过不同运营单位的等价增量成本来处理经济负荷分配,以实现最有效和最有效的分配。由具有足够储备容量的不同单元进行的经济发电,以满足任何异常运行条件。目标函数的目标是降低成本,因此在计算生产成本时,我们使用lambda迭代法进行经济调度。还简要讨论了将优先级分配给不同发电机组的方法。最后,我们希望使用两种不同的方法来求解潮流解决方案,并比较它们的结果以获得最优化的生成方式,并使用MATLAB对其进行验证。