首页> 外文OA文献 >Reliability, Availability and Maintainability Analysis of the Main Conveyor System in Underground Coal Mine: A Case Study of Churcha (RO) Mine
【2h】

Reliability, Availability and Maintainability Analysis of the Main Conveyor System in Underground Coal Mine: A Case Study of Churcha (RO) Mine

机译:地下煤矿主输送系统的可靠性,可用性和可维护性分析:以丘吉拉(RO)煤矿为例

摘要

Estimation of reliability, maintainability and availability assumes an important role in performance evolution of mining system or equipment. Reliability forecasts are necessary for every type of the machinery, similar to maintenance planning, production planning, reliability assessment, fault detection in the production system of mine, and risk evaluation. The mining system’s reliability, maintainability and availability have assumed great significance in present years due to a competitive environment and overall operating condition and production purpose. The performance of the system depends on reliability and availability of the machinery used, working environment, maintenance, operation process and specialized skill of operators, etc. The aim of the proposed study is to analyze operating reliability, maintainability and availability of the main conveyor system in an underground coal mine. The study uses the failure and repair data of the main conveyor system of Churcha (RO) coal mine in India. The main conveyor system in the mine has seven subsystems. This analysis has developed a method to identify the critical and sensitive subsystems or components of the main Conveyor system that need more attention for improvement. In this research work, we suggest the way to improve the reliability and availability of a repairable system. In the way, the concept of importance measures must be used to prioritize the components or subsystems for availability improvement processes. Availability significance measures the criticality of each component based on different points of view such as availability, failure rate, and repair rate of each subsystem. The reliability and availability of repairable systems can be enhanced by applying proper maintenance strategies. For each subsystem, best fit models were selected for reliability and maintainability analyses. The empirical data of the conveyor system at Churcha (RO) mine of SECL are used as a case study for reliability, availability and maintainability strategies analysis.The study shows that the reliability and maintainability analysis is greatly helpful for deciding maintenance intervals, planning and organizing maintenance of main conveyor system in the mine. The outcomes demonstrate that availability and reliability significance measures can be utilized as a rule for organizing the efforts for reliability and availability improvement of a system.ud
机译:可靠性,可维护性和可用性的估计在采矿系统或设备的性能演变中起着重要作用。每种机械类型的可靠性预测都是必需的,类似于维护计划,生产计划,可靠性评估,矿山生产系统中的故障检测以及风险评估。由于竞争激烈的环境以及整体运行状况和生产目的,采矿系统的可靠性,可维护性和可用性在近年来已具有重要意义。系统的性能取决于所用机械的可靠性和可用性,工作环境,维护,操作过程和操作员的专业技能等。所提出的研究目的是分析主输送机系统的运行可靠性,可维护性和可用性在地下煤矿该研究使用了印度丘吉拉(RO)煤矿主输送机系统的故障和维修数据。矿山中的主要输送机系统具有七个子系统。该分析已经开发出一种方法,用于识别主要输送系统的关键和敏感子系统或组件,这些子系统或组件需要更多关注以进行改进。在这项研究工作中,我们提出了提高可修复系统的可靠性和可用性的方法。这样,重要性度量的概念必须用于为可用性改进过程确定组件或子系统的优先级。可用性重要性基于不同的角度(例如,每个子系统的可用性,故障率和维修率)来衡量每个组件的关键性。通过应用适当的维护策略,可以提高可修复系统的可靠性和可用性。对于每个子系统,都选择了最佳拟合模型来进行可靠性和可维护性分析。以SECL的Churcha(RO)矿山的输送机系统的经验数据为例,进行可靠性,可用性和可维护性策略分析。研究表明,可靠性和可维护性分析对于确定维护间隔,计划和组织工作有很大帮助。维护矿井中的主输送机系统。结果表明,可用性和可靠性重要性度量可以作为组织系统可靠性和可用性改进工作的规则。

著录项

  • 作者

    Kumar Pritam;

  • 作者单位
  • 年度 2016
  • 总页数
  • 原文格式 PDF
  • 正文语种
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号