首页> 外文OA文献 >Settlement of a high embankment and overpass structures in Ottawa
【2h】

Settlement of a high embankment and overpass structures in Ottawa

机译:渥太华高路堤和立交桥结构的沉降

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Settlement observations have been conducted over a 5-year period on a 20-ft-high earth embankment and 2 highway overpass structures founded on spread footings over a thick deposit of Leda clay. The applied stresses were considerably less that the overconsolidation pressure of the clay. In the five years since construction, settlements of approximately 12 cm have occurred, of which about 4 cm occurred immediately. The observed settlements are compared with settlement predictions on the basis of various types of laboratory tests. The observations indicate that significant settlements occur on a long-term basis and can be attributed to a slow yielding of the clay structure. Piezometers failed to detect any excess pore water pressure due to slow process of consolidation.
机译:在5年的时间里,对一个20英尺高的土堤和2个高速公路立交桥结构进行了沉降观测,该立交桥结构建立在Leda黏土厚层上的分布基础上。施加的应力明显小于粘土的超固结压力。自建设以来的五年中,发生了约12厘米的沉降,其中约4厘米立即发生。在各种类型的实验室测试的基础上,将观察到的沉降与沉降预测进行比较。观察结果表明,长期发生大量沉降,这可归因于粘土结构的缓慢屈服。压强计由于缓慢的固结过程未能检测到任何多余的孔隙水压力。

著录项

  • 作者

    Burn, K. N.;

  • 作者单位
  • 年度 1969
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号