首页> 外文OA文献 >Integrated Geoprocessing for Generation of Affected Assets and Rights Reports for High Voltage Electrical Infrastructures
【2h】

Integrated Geoprocessing for Generation of Affected Assets and Rights Reports for High Voltage Electrical Infrastructures

机译:集成地理处理,以生成高压电气基础设施的受影响资产和权利报告

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

The development of linear construction projects, such as roads, railways, gas pipelines and electricity installations among others, whose execution on the territory impact a number of real estates, implies calculation of the effects over the plots in order to rewards landowners in terms for the influence of these new constructions on their properties as the case of Assets and Rights. This paper is about the high voltage electrical installations projects, focussed on the optimization GeoProcessing workflow for the generation of affected Assets and Rights Reports (ARR) for landowners due to the impact of affections for building electrical installations. This calculation and the generation of reports are carried out in different stages, requiring geoprocessing of different types of electrical constructions affections over the land, whose data come from different local and remote (Web services) sources. These overall characteristics make the process complex, timeconsuming and requiring many resources. This paper shows the study case of the Integrated Geoprocessing for calculation of the affected ARR as a result of the new electrical conveyance infrastructures in Spain. The challenge consists of complying with the planning objectives as defined by the Ministry of Industry, Tourism and Trade (MITYC) for 2016, and reviewed for 2020, which implies the new creation of circuits and substations. In order to assisting in the accomplishment of those objectives and with the purpose of automating part of that workflow, an application software has been developed that integrates parts of the stages of that flow. The integrated stages are: (a) encoding of the plots susceptible to be affected; (b) calculation (geoprocessing) capable of processing 15 types of affections; (c) generation of an alphanumerical report with information about the owners of the affected plots and the ARR; (d) storage and Internet publishing of the affections caused by the projects through OGC Web Services and an ISO TC211 standard-based server for result dissemination in other formats. Up to five different data sources (two local, three remote) may come into play. The use of this application in the creation of the ARR has allowed improving productivity by optimising the amount of ARR generated per annum, the amount of calculated affections, the reliability of the calculations and the terms, thus reducing the cost of this activity.
机译:线性建设项目的开发,例如道路,铁路,天然气管道和电力装置等,其在领土上的执行会影响许多房地产,这意味着要计算出地块的影响,以奖励土地所有者对土地的奖励。这些新建筑对其资产的影响,例如资产和权利。本文是关于高压电气装置项目的,重点是优化GeoProcessing工作流程,以生成对建筑物电气装置的影响,从而为土地所有者生成受影响的资产和权利报告(ARR)。此计算和报告的生成在不同的阶段进行,需要对土地上不同类型的电气构造影响进行地理处理,其数据来自不同的本地和远程(Web服务)源。这些总体特征使过程复杂,耗时且需要大量资源。本文展示了综合地理处理的研究案例,该计算案例是由于西班牙新的电力输送基础设施而导致受影响的ARR的计算。面临的挑战包括遵守工业,旅游和贸易部(MITYC)于2016年确定的规划目标,并于2020年进行审查,这意味着要新建电路和变电站。为了帮助实现这些目标并以使该工作流程的一部分自动化的目的,已开发了一种应用程序软件,该软件集成了该流程的各个阶段。综合阶段是:(a)对易受影响地块的编码; (b)能够处理15种情感的计算(地理处理); (c)生成字母数字报告,其中包含有关受影响地块的所有者和ARR的信息; (d)通过OGC Web服务和基于ISO TC211标准的服务器存储和互联网发布项目引起的影响,并以其他格式传播结果。最多可以使用五个不同的数据源(两个本地,三个远程)。在创建ARR中使用此应用程序可以通过优化每年生成的ARR量,计算的情感量,计算的可靠性和条款来提高生产率,从而降低这项活动的成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号