首页> 外文OA文献 >Storage requirements for PV power ramp-rate control
【2h】

Storage requirements for PV power ramp-rate control

机译:光伏功率斜率控制的存储要求

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Short-term variability in the power generated by large grid-connected photovoltaic (PV) plants can negatively affect power quality and the network reliability. New grid-codes require combining the PV generator with some form of energy storage technology in order to reduce short-term PV power fluctuation. This paper proposes an effective method in order to calculate, for any PV plant size and maximum allowable ramp-rate, the maximum power and the minimum energy storage requirements alike. The general validity of this method is corroborated with extensive simulation exercises performed with real 5-s one year data of 500 kW inverters at the 38.5 MW Amaraleja (Portugal) PV plant and two other PV plants located in Navarra (Spain), at a distance of more than 660 km from Amaraleja.
机译:大型并网光伏(PV)电站产生的电力的短期波动可能会对电能质量和网络可靠性产生负面影响。新的电网法规要求将光伏发电器与某种形式的储能技术结合起来,以减少短期光伏发电波动。本文提出了一种有效的方法,以便针对任何光伏电站规模和最大允许斜率计算最大功率和最小储能需求。该方法的一般有效性得到了广泛的模拟练习的证实,该练习使用了38.5 MW Amaraleja(葡萄牙)光伏电站和位于Navarra(西班牙)的两个其他PV电站的500 kW逆变器的真实5年期一年数据进行了仿真距离Amaraleja超过660公里。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号