KAJIAN KEBUTUHAN TENAGA KERJA KONSTRUKSI PADA PROYEK PEKERJAAN PERENCANAAN DAN PEMBANGUNAN GEDUNG INSTALASI RADIOLOGI RUMAH SAKIT PARU udDR. H. A. ROTINSULU

机译:肺部医院放射学建设项目规划和开发项目中的建筑工程需求研究博士H.罗汀苏鲁

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Perbedaan perhitungan tenaga kerja terampil terjadi akibat adanya biaya tak lngsung faktor resiko yang dibebankan pada Analisa Harga Upah Satuan (AHS) atau yang dikenal dengan harga satuan pekerjaan (HSP) Upah. Pada data dokumentasi perencanaan tenaga kerja terampil yang di dapat dari pelaksanaan pembangunan kontraktor dan perhitungan jumlah tenaga kerja terampil yang didasarkan pada AHS mengidentifikasikan bahwa terjadi perbedaan kebutuhan tenaga kerja terampil tersebut. Tugas Akhir ini bertujuan untuk : 1). Mengetahui jumlah tenaga kerja yang diperoleh dari Analisa Harga Satuan pada saat BID PRICE, 2). Membandingkan jumlah tenaga kerja antara dokumen kontrak dengan perhitungan Analisa Harga Satuan (AHS), 3). Mengevaluasi selisih persentase kebutuhan tenaga kerja antara dokumen kontrak dengan perhitungan Analisa Harga Satuan (AHS). Berdasarkan hasil perhitungan yang dilakukan oleh penulis dapat disimpulkan bahwa kajian kebutuhan tenaga kerja yang diperoleh dalam perhitungan adalah sebagai berikut :1). Jumlah tenaga kerja yang diperoleh dari Perhitungan AHS adalah sebanyak 8.140 Tenaga Kerja. 2). Perbandingan jumlah tenaga kerja antara dokumen kontrak dengan AHS adalah sebanyak 436 tenaga kerja dimana perhitungan AHS lebih banyak jumlah tenaga kerjanya. 3). Jumlah selisih persentase antara perhitungan dokumen kontrak dengan perhitungan AHS adalah sebenyak 5.08%.ududKata Kunci : ududTenaga Kerja Terampil, Rencana Anggaran Biaya (RAB), Volume Pekerjaan, Harga Satuan Pekerjaan (HPS).ududDifferences in the calculation of skilled labor are the result of risk factors lngsung charges imposed on Wages Price Analysis Unit ( AHS ) , known as unit price ( HSP ) Wages . In the data of skilled manpower planning documentation obtained from the implementation of the construction contractor and the calculation of the amount of skilled labor that is based on AHS identified a difference in the need for skilled labor . This final project aims to : 1 ) . Knowing the amount of labor that is obtained from the analysis of Unit Price at the time of BID PRICE , 2 ) . Comparing the amount of labor between the contract documents with calculations Analysis Unit ( AHS ) , 3 ) . Evaluate the percentage difference between the labor requirements of contract documents with calculations Analysis Unit ( AHS ) . Based on calculations performed by the authors to conclude that the workforce needs assessment obtained in the calculations are as follows : 1 ) . The amount of labor is obtained from the calculation as much as 8,140 AHS Labor . 2 ) . Comparison of the amount of labor between the AHS contract documents are 436 workers where more number of AHS calculation of its workforce . 3 ) . Calculating the percentage difference between the number of contract documents with calculations sebenyak AHS is 5.08 % .ududKeywords :udSkilled Labor , Budget Plan ( RAB ) , Volume of Work , Employment Unit ( HPS ) .
机译:熟练工计算的差异是由于单位工资价格分析(AHS)或称为工资单位价格(HSP)的风险因素成本所致。从承包商的建设中获得的熟练劳动力规划文件和基于AHS的熟练工人数量计算中发现,对熟练工人的需求存在差异。该最终项目旨在:1)。知道从BID PRICE的单价分析获得的工人数量,2)。将合同文件之间的工人数量与单价分析(AHS)计算进行比较,3)。使用单价分析(AHS)计算来评估合同文件之间的人工需求百分比差异。根据作者进行的计算结果,可以得出结论,对计算得出的劳动力需求的研究如下:1)。通过AHS计算得出的工人数量为8,140名。 2)。合同文件和AHS之间的工人数比较为436名工人,其中AHS计算的工人数更多。 3)。合同文件的计算与AHS的计算之间的百分比差异约为5.08%关键词:熟练劳动力,熟练劳动力,预算计划(RAB),工作量,单价(HPS)。熟练劳动力的计算是直接对工资价格分析单位(AHS)收取费用的风险因素的结果,称为单价(HSP)工资。在从施工承包商的实施和基于AHS的熟练劳动力数量的计算中获得的熟练人力规划文档的数据中,确定了对熟练劳动力需求的差异。该最终项目旨在:1)。知道从BID PRICE时的单价分析中获得的劳动力数量,2)。将合同文件之间的劳动量与计算分析单元(AHS)比较3)。用计算分析单元(AHS)评估合同文件的人工要求之间的百分比差异。根据作者进行的计算,包括在计算中获得的劳动力需求评估如下:1)。从计算中获得的人工数量多达8,140 AHS人工。 2)。 AHS合同文件之间的劳动量比较为436名工人,其中AHS计算其劳动力的数量更多。 3)。用AHS计算得出的合同文件数量之间的百分比差异为5.08%。Ud ud关键字:ud熟练工人,预算计划(RAB),工作量,就业单位(HPS)。

著录项

  • 作者

    GAMANANDA RUDY;

  • 作者单位
  • 年度 2014
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类