摘要

Subsistem Cirata 150 kV merupakan bagian dari sistem interkoneksi Jawa Barat 150 kV. Subsistem Cirata 150 kV disuplai oleh dua unit IBT 500/150 kV dengan kapasitas daya masing-masing IBT adalah 500 MVA. Subsistem Cirata memiliki 13 saluran transmisi yang menghubungkan 8 Gardu Induk (GI) dan memiliki total 17 transformator 150/20 kV dengan kapasitas daya 930 MVA, sementara unit pembangkitan yang ada di subsistem Cirata 150 kV adalah PLTPb Patuha dengan daya 55 MW. Keandalan pada sistem tenaga listrik harus tetap dijaga agar suplai daya dari pembangkit menuju ke konsumen tetap berlangsung dengan baik. Pada kondisi tertentu, seperti pada kondisi beban puncak dan kondisi kontingensi, suatu sistem tenaga listrik akan mengalami perubahan-perubahan nilai, baik itu arus maupun tegangan. Pada penelitian ini, gangguan yang akan dianalisa adalah kontingensi (N-1), yaitu terlepasnya salah satu saluran pada sistem. Kemudian menganalisa perubahan arus dan tegangan untuk mempersiapkan perbaikan pada sistem. Perbaikan yang dilakukan pada saat kontingensi adalah dengan pelepasan beban (load shedding). Keandalan yang diukur setelah load shedding adalah mengukur kualitas daya dan menghitung indeks SAIFI dan SAIDI pada sisi beban. Pada saat kontingensi (N-1), terjadi penurunan nilai tegangan dibawah SPLN pada beberapa rel GI, diantaranya rel Cigereleng (124.8 kV), rel Lagadar (125.4 kV), rel Padalarang (126.1 kV), rel Bandung Utara (125.5 kV) dan rel Cibabat (125.6 kV). Sementara faktor daya pada transformator Lagadar 1 dan Pabuaran 2 adalah 0.47 dan 0.83. Indeks SAIFI 2.88 kali/ pelanggan/ tahun dan SAIDI 8.81 jam/ pelanggan/ tahun.udKata kunci: Keandalan sistem tenaga listrik, analisis kontingensi (N-1), load shedding.ududCirata's subsystem 150 kV is part of West Java 150 kV interconnection system. Cirata's subsystem 150 kV supplied by two units of IBT 500/150 kV with a power capacity of each IBT is 500 MVA. Cirata's subsystem has 13 transmission lines that connect the 8 Substation and has a total of 17 150/20 kV transformer with a power capacity of 930 MVA, while the existing generation units at Cirata's subsystem 150 kV is PLTPb Patuha with 55 MW. The reliability of the power system must be maintained in order to supply power from the generator to the consumer to keep going well. Under certain conditions, such as peak load conditions and contingencies conditions, a power system will undergo changes in value, both the current and voltage. In this study, a disorder that will be analyzed is the contingency (N-1), a discharge of one of the lines on the system. Then the value of changes in current and voltage are need to improve the system. Improvements made during the contingencies is to release the load (load shedding). Reliability was measured after load shedding is a measure of power quality and SAIFI and SAIDI's index count on the load side. At the time of contingency (N-1), a decline in the value of the voltage below SPLN (standard) on some buses, including Cigereleng's bus (124.8 kV), Lagadar's bus (125.4 kV), Padalarang bus (126.1 kV), North Bandung's bus (125.5 kV) and Cibabat's bus (125.6 kV). While the transformer power factor of Pabuaran Lagadar 1 and 2 are 0.47 and 0.83. SAIFI index is 2.88 times/ customer/ year and SAIDI index is 8.81 hours/ customer/ year.ududKeyword: Reliability of electrical power system, contingency (N-1), load shedding.
机译:150 kV Cirata子系统是150 kV West Java互连系统的一部分。 Cirata 150 kV子系统由两个IBT 500/150 kV单元供电,每个IBT的功率容量为500 MVA。 Cirata子系统具有连接8个变电站(GI)的13条传输线,并且总共具有17个150/20 kV变压器,功率容量为930 MVA,而150 kV Cirata子系统中的发电机组是Patuha PLTPb,具有55 MW的功率。必须保持电力系统中的可靠性,以便从发电机到用户的电源继续正常运行。在某些情况下,例如峰值负载情况和应急情况,电力系统将经历电流和电压值的变化。在这项研究中,要分析的干扰是偶发事件(N-1),即系统中一个通道的丢失。然后分析电流和电压的变化,以准备对系统进行改进。应急过程中的改进是减少了负载。减载后测得的可靠性是在测量电能质量并在负载侧计算SAIFI和SAIDI指数。在突发事件(N-1)期间,一些GI轨道上的电压值降低到SPLN以下,包括Cigereleng轨道(124.8 kV),Lagadar轨道(125.4 kV),Padalarang轨道(126.1 kV),North Bandung轨道(125.5 kV)和Cibabat轨​​道(125.6 kV)。 Lagadar 1和Pabuaran 2变压器的功率因数分别为0.47和0.83。 SAIFI指数2.88次/客户/年,SAIDI 8.81小时/客户/年关键词:电力系统可靠性,偶然性分析(N-1),减载 Ud ud udCirata的150 kV子系统是西爪哇150的一部分kV互连系统。由两个IBT 500/150 kV单位提供的Cirata子系统150 kV,每个IBT的功率容量为500 MVA。 Cirata的子系统具有连接8个变电站的13条传输线,总共具有17台150/20 kV变压器,功率容量为930 MVA,而Cirata的150 kV子系统中的现有发电机组是55 MW的PLTPb Patuha。必须保持电力系统的可靠性,以便从发电机向用户供电,以保持正常运行。在某些情况下,例如峰值负载情况和应急情况,电力系统的电流和电压值都会发生变化。在这项研究中,将要分析的障碍是意外事件(N-1),即系统上线路之一的放电。然后需要改变电流和电压的值来改善系统。突发事件期间所做的改进是释放负载(减少负载)。在切负荷是电能质量以及负载侧SAIFI和SAIDI指标计数的量度之后,测量可靠性。在突发事件(N-1)时,某些总线的电压值下降到SPLN(标准)以下,包括Cigereleng的总线(124.8 kV),Lagadar的总线(125.4 kV),Padalarang总线(126.1 kV),北万隆的母线(125.5 kV)和Cibabat的母线(125.6 kV)。而Pabuaran Lagadar 1和2的变压器功率因数分别为0.47和0.83。 SAIFI指数是2.88倍/客户/年,而SAIDI指数是8.81小时/客户/年。 Ud ud关键字:电力系统的可靠性,突发事件(N-1),减载。

著录项

  • 作者

    Nugraha Diki;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号