首页> 外文OA文献 >Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach
【2h】

Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

机译:依赖于头的级联水力系统的调度:混合整数二次规划方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper is on the problem of short-term hydro, scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.
机译:本文是关于短期水电调度的问题,尤其是与水头相关的梯级水电系统。我们提出一种新颖的混合整数二次规划方法,不仅要考虑扬程依赖性,还要考虑不连续的工作区域和放电斜率约束。因此,由于本文提出了更为现实的模型,因此提供了增强的短期水力调度。基于葡萄牙梯级水利系统的两个案例研究的数值结果说明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号