首页> 外文OA文献 >Nonlinear optimization method for short-term hydro scheduling considering head-dependency
【2h】

Nonlinear optimization method for short-term hydro scheduling considering head-dependency

机译:考虑水头依赖性的短期水力调度非线性优化方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent reservoirs under competitive environment. We propose a new nonlinear optimization method to consider hydroelectric power generation as a function of water discharge and also of the head. Head-dependency is considered on short-term hydro scheduling in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems, providing a higher profit at a negligible additional computation time in comparison with a linear optimization method that ignores head-dependency.
机译:本文是关于短期水力调度的问题,特别是关于竞争环境下依赖水头的水库。我们提出了一种新的非线性优化方法,将水力发电作为排水量和扬程的函数。为了获得更现实和可行的结果,在短期水力调度中考虑了水头依赖性。所提出的方法已成功应用于解决基于葡萄牙一个主要梯级水力系统之一的案例研究,与忽略头依赖的线性优化方法相比,该方法在忽略额外计算时间的情况下提供了更高的收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号