首页> 外文OA文献 >An expert assessment of the construction conditions during the excavation of královopolský tunnel
【2h】

An expert assessment of the construction conditions during the excavation of královopolský tunnel

机译:克拉洛沃波尔斯基隧道开挖过程中施工条件的专家评估

摘要

As a result of the excavation of Královopolský tunnel, situated under Dobrovského and Veleslavínova streets in Brno, some depressions and inclinations of existing buildings have happened. In the article we are dealing with the time flow of deformations on representative buildings and the process of long-term registering of cracks in the time-dependency. The malfunctions were monitored after the excavation of check tunnels in the 2001 – 2006 period and again during the excavation in 2006 – 2007; they are monitored till nowadays. The monitoring records have been entered into the tables in the time-dependency and these dependencies were graphically presented. On the basis of 'Static ensuring of the existing surface building' project documentation the static ensuring was projected and lastly implemented in most of the objects.
机译:在布尔诺Dobrovského和Veleslavínova街道下面的Královopolský隧道开挖的结果是,现有建筑物发生了一些凹陷和倾斜。在本文中,我们将讨论具有代表性的建筑物的变形的时间流以及与时间相关的裂缝的长期记录过程。在2001年至2006年期间开挖检查隧道之后以及在2006年至2007年开挖期间再次监测故障。直到今天,它们都受到监视。监视记录已按时间依赖性输入到表中,并且以图形方式显示了这些依赖性。根据“现有表面建筑的静态确保”项目文档,静态保证被投影并最终在大多数对象中实施。

著录项

  • 作者

    Kostka Rostislav;

  • 作者单位
  • 年度 2015
  • 总页数
  • 原文格式 PDF
  • 正文语种 {"code":"cs","name":"Czech","id":5}
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号