Understanding the mechanisms by which any engineering structure resists load is an essential requirement for its consistent and reliable design. The axial resistance which can be mobilised by piled foundations in liquefiable soils when subjected to strong shaking remains highly uncertain, and a number of piled foundations have failed in strong earthquakes as recently as 2011 . The lack of visible foundation distress in many such cases indicates that failure can occur as a result of the loss of axial capacity during an earthquake, as opposed to the laterally-dominated failure modes which have been the focus of the research community for the last 20 to 30 years.In this thesis, a series of dynamic centrifuge experiments have been carried out to establish how the distribution of axial loads along the length of a pile changes during a strong earthquake. In each test, a 2 × 2 pile group was installed such that its tips were embedded in a dense sand layer which was overlain by liquefiable soil. The tests examine the effects arising from the hydraulic conductivity in the bearing layer, the influence of axial pile cap support and finally whether there are any differences in the behaviour of nominally jacked or bored piles under seismic loading.The pile cap has been shown to play a substantial role in supporting axial loads during strong shaking. In cases where the pile cap was unable to support axial load, the majority of the axial loading was carried as pile end bearing, with some shaft friction being mobilised in both the liquefiable and bearing soil layers as a result of relative lateral displacements between the soil and pile. However, where the pile cap is able to support axial loads, the settlement of the pile cap into the soil led to a dramatic transfer of axial load away from the piles and onto the pile cap. These results imply that where substantial excess pore pressures may be generated at the depth of the pile tip, then the pile caps must be able to support significant axial load. The increased effective stresses below the pile cap were responsible for the mobilisation of shaft friction on the section of pile within the liquefiable layer. However, these piles were unable to mobilise shaft friction in the bearing layer due to the reduced lateral loading on the piles. The axial behaviour of the piled foundations after the end of strong shaking is affected by the recovery of pile end bearing capacity and is therefore strongly dependent on the hydraulic conductivity of the bearing layer. The axial behaviour of nominally bored and jacked pile groups in liquefiable soil deposits are very different under seismic excitation, with the installation process of the latter substantially altering the soil conditions around the tips of the pile, such that in contrast to the bored pile groups, the jacked pile groups did not accumulate settlements until significantly after the strong shaking had commenced. These results imply that the method of installation is an important factor in the seismic response of a foundation, and may be more pronounced for real earthquakes where the number of strong shaking cycles may be more limited than those simulated in the experiments.
机译:了解任何工程结构抵抗负载的机制是其一致而可靠的设计的基本要求。液化土壤中的桩基在受到强烈震动时可以动员的轴向阻力仍然非常不确定,并且直到2011年,许多桩基在强震中都失败了。在许多情况下,由于缺乏可见的地基应力,表明地震可能是由于轴向力的损失而发生的,而在过去20年来,横向主导的破坏模式一直是研究界关注的重点。到30年。本文进行了一系列的动态离心实验,以确定在强烈地震期间沿桩长轴向载荷的分布如何变化。在每个测试中,都安装了一个2×2桩组,其尖端被埋在被液化土覆盖的致密沙层中。该测试检查了轴承层中的水力传导率所产生的影响,轴向桩帽支撑的影响以及最终在地震荷载下标称顶进桩或钻孔桩的行为是否存在差异。在强烈晃动期间在支撑轴向载荷方面起着重要作用。在桩帽无法承受轴向载荷的情况下,大部分轴向载荷作为桩端轴承承载,由于土壤之间的相对侧向位移,在可液化和承载土层中都产生了一些轴摩擦力和桩。但是,在桩帽能够支撑轴向载荷的情况下,桩帽沉降到土壤中会导致轴向载荷从桩基转移到桩帽上的剧烈转移。这些结果表明,在桩尖的深度处可能会产生相当大的孔隙压力时,桩帽必须能够承受很大的轴向载荷。桩帽下方有效应力的增加是导致可液化层中桩截面上的竖井摩擦力动员的原因。但是,由于桩上的横向载荷减小,这些桩无法在轴承层中移动轴摩擦。强烈晃动结束后,桩基的轴向性能会受到桩端承载力恢复的影响,因此在很大程度上取决于承载层的水力传导率。在地震激励下,名义上钻孔和顶进的桩组在可液化土壤沉积物中的轴向行为有很大不同,后者的安装过程极大地改变了桩端周围的土壤条件,因此与钻孔桩相比,顶起的桩组直到强烈的震动开始后才开始积累沉降。这些结果表明,安装方法是基础地震响应中的重要因素,对于真实的地震可能更明显,在真实的地震中,强震动周期的数量可能比实验中模拟的数量更多。

著录项

  • 作者

    Stringer Mark;

  • 作者单位
  • 年度 2012
  • 总页数
  • 原文格式 PDF
  • 正文语种 en
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号