首页> 外文OA文献 >Field Tests of Wind Turbine Unit with Tandem Wind Rotors and Double Rotational Armatures
【2h】

Field Tests of Wind Turbine Unit with Tandem Wind Rotors and Double Rotational Armatures

机译:带有双转子和双转子电枢的风力发电机组的现场测试

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

This paper discusses the field tests of the wind turbine unit, in which the front and the rear wind rotors drive the inner and the outer armatures of the synchronous generator. The wind rotors were designed conveniently by the traditional procedure for the single wind rotor, where the diameters of the front and the rear wind rotors are 2 m and 1.33 m. The tests were done on a pick-up type truck driven straightly at constant speed. The rotational torque of the unit is directly proportional to the induced electric current irrespective of the rotational speeds of the wind rotors, while the induced voltage is proportional to the relative rotational speed. The performance of the unit is significantly affected not only by the wind velocity, but also by the blade setting angles of both wind rotors and the applied load especially at lower wind velocity.
机译:本文讨论了风力发电机组的现场测试,其中前后风轮驱动同步发电机的内部和外部电枢。通过传统方法为单个风力转子方便地设计了风力转子,其中前后风力转子的直径分别为2 m和1.33 m。测试是在恒定速度直行的皮卡车上进行的。单元的旋转转矩与风力发电机的转速成正比,与风力发电机的转速成正比,而感应电压与相对转速成正比。机组的性能不仅受风速的影响很大,而且受两个风轮的叶片设置角度和施加的负载的影响很大,特别是在风速较低时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号