Job shop scheduling for missed due-date performance

机译:作业车间计划,错过了截止日期的表现

摘要

Relatively little job shop scheduling research has focused on the missed due-date performance. In this paper, we investigate how two important decision factors, namely dispatching rules and due-date assignment methods, affect the missed due-date performance in job shop scheduling. A new dispatching rule and two new due-date setting models are developed in order to improve the performance criteria based on missed due dates. The new due-date models are capable of adjusting dynamically the flowtime estimation by using feedback information about current shop load conditions. Simulation results show that the proposed dynamic due-date models are significantly better than their static counterparts. The best missed due-date performance is observed when a combination of a dynamic due-date setting model and an appropriate due-date-dependent dispatching rule is employed. In addition, the new models are simple and easy to implement without preliminary runs for parameter estimation.
机译:相对较少的作业车间调度研究集中在错过的截止日期性能上。在本文中,我们研究了两个重要的决策因素,即调度规则和截止日期分配方法,如何影响作业车间调度中错过的截止日期性能。开发了新的调度规则和两个新的到期日期设置模型,以便根据错过的到期日期改进绩效标准。新的到期日期模型能够通过使用有关当前车间负荷状况的反馈信息来动态调整流量时间估计。仿真结果表明,所提出的动态到期日模型明显优于静态模型。当使用动态到期日设置模型和适当的取决于到期日的调度规则的组合时,可以观察到最佳的错过到期日性能。此外,新模型简单易行,无需进行初步的参数估计。

著录项

  • 作者

    Cheng TCE; Jiang J;

  • 作者单位
  • 年度 1998
  • 总页数
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类

相似文献

  • 外文文献
  • 中文文献
  • 专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号